Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

RES: MINIMUM HOUSING

Entered Date:

02/11/2021

Applicant:

MELARA SONIA & ROMAN TOMAS CP/RS

Description:

Patch in the living room; bathroom is leaking creating mold. Kitchen under construction for 4 months, only drywall; don't have kitchen cabinets or counter and have temporary sink. Outside by the kitchen no Stucco wall.

Completed Inspections

Case Status: COMPLIAN
Case Number: T21DV00755
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 2
End Date Description Inspector Results Comments
02/17/2021 INSP - INITIAL CODE ENFORCMENT GOODMAN Approved I VISITED SITE AND MET WITH THE OCCUPANTS WHO ALLOWED ENTRY INTO THE UNIT. AT THIS TIME THE SINK PORTION OF THE KITCHEN CABINETS HAD BEEN REMOVED, THE AREA INSIDE THE WALL HAD BEEN BLEACHED, THE DAMAGED SEWER LINE TO THE OUTSIDE WALL HAD BEEN REPAIRED. THE DRYWALL ON THAT WALL HAD BEEN REPLACED AND STUCCO PATCH ON THE OUTSIDE HAD BEEN REPAIRED. LEAKING CEILING HAD BEEN PATCH AND RECOATED BY ROOF SAVERS. ALPHA BUILDERS WERE WAITING ON CABINETS AT THIS TIME AND WHEN THE CABINETS GO IN THE TILE AND THE COUTERTOPS WILL BE COMPLETED. I EXPLAINED THAT EVEN THOUGH THE COMPLAINT WAS CALLED IN ON NOV 23, THE CONTRACTOR HAD TO COME BY AND GIVE A BID WHICH WAS THEN SUBMITTED TO INSURANCE AND ALL AROUND THE HOLIDAYS AND THAT TOOK A LITTLE TIME . I WAS TOLD BY MANAGER THAT OWNER DID NOT RECEIVE A CHECK FROM INSURANCE UNTIL JANUARY 16TH. I EXPLAINED TO THE OCCUPANTS THAT THEY WERE FAR ENOUGH INTO THE THE WORK THAT THE CITY WOULD NOT BE ABLE TO CONSIDER THIS NEGLIGENT DUE TO THE AMOUNT OF WORK COMPLETED AND MATERIALS ALREADY ORDERED FOR THE PROJECT. I DID GIVE THE OCCUPANTS MY CARD AND ASKED THEY CONTINUE TO CONTACT ME IF THERE ARE ANY PROBLEMS AND I WOULD NOT CLOSE THE CASE UNTIL COMPLETION WAS NEAR. I TRIED CONTACTING MANAGER BUT PLAYED PHONE TAG ALL DAY, WILL CONTINUE TO FOLLOW UP
03/04/2021 INSP - FOLLOW UP CODE ENFORCE GOODMAN Approved I SPOKE WITH THE OCCUPANTS WHO STATED THAT THE BUILDERS HAVE MOVED FORWARD WITH THE CABINETS AND THAT MOLD AREAS IN THE BATHROOM CEILINGS ARE BEING ADDRESSED. I INFORMED THEM THAT I WOULD MOVE FORWARD WITH CLOSING MY CASE DUE TO THE MANAGEMENT ABATING ISSUES AS REQUIRED. COMPLIANCE / CLOSE CASE.