Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T20DV03028
Case Details
Entered Date:
05/03/2020
Applicant:
FOOD CITY #156
Description:
COMMUNICATION CALLED THAT T.F.D. ON SITE WITH A BUILDING FIRE, F201240093
Completed Inspections
Case Status: COMPLIAN
Case Number: T20DV03028
Case Description: EMERGENCY
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/03/2020 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | Communication called that T.F.D. on site with a building fire. Arrived and all the units have cleared the site. The fire was in the rear of the building where they were roasting green chiles. The fire was stored boxes of carboard boxes and plastic cases for plastic bottles. Did have some metal racks that filled with stored items. Did have 2-portable refrigerators that were not working and those were burned for a total lost. Did have large porpane tanks and those were not secured properly and were scattered all in the area. Has an outlet on the exterior that is not GFCI protected and lacking a bubble cover per code. Has trash and debris from the burned items and where the metal covering for the walk in freezer was pulled off to check for fire on the foam in the panels for the freezer. Pima County was on site to check the food and the area of the fire. Did have someone to check on the freezer if the freezer was working properly and maintaining the temperature for the freezer. At this time the freezer is maintaining temperature to remain being used. The store director was on site and signed the paperwork. Did go over the permits on the panels for the freezer. This area of the fire is by the cooling tower for the chillers for the store and the equipment for the food. The area will be secured and cleaned by the store employees. RV. |
05/07/2020 | INSP - FOLLOW UP CODE ENFORCE | VIDAL | Approved | Met with the manager and check the site. The propane tanks have been tied off together in a corner for the tanks to be picked up. The area is in the same and has a crew set to come next week to clean the area and measure the panels on the freezer to be ordered. They will not be cooking chiles or roasting chiles in the area any more. At this time the case will be closed and working with the insurance and the contractor for the company. Violation Abated, Close Case. RV. |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T20DV03028
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
Date | Name |
05/03/2020 | NOTICE OF VIOLATION ISSUED |
05/03/2020 | STRUCTURE SECURED BY ??? |