Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T19DV03434
Case Details
Entered Date:
04/28/2019
Applicant:
MENLO PARK SHOPPING CENTER COMPANY ATTN: PAUL ASH MGMT CO LLC
Description:
COMMUNICATION CALLED THAT T.F.D. ON SITE WITH A FIRE IN THE REAR OF BUILDING, F191170255
Completed Inspections
Case Status: COMPLIAN
Case Number: T19DV03434
Case Description: EMERGENCY
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/27/2019 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | Communication called that T.F.D. on site with a fire on the exterior of the building. The fire was on the exterior of the building and burned a pile of compacted cardboard stacked on the rear of the building. The fire did not get inside the building but when the overhead door was opened to check where the fire was, some smoke did get into the store. Some of the breakers were tripped for lighting on the exterior of the building, the compactor, and some other electrical wiring that was burned in the fire and goes to the roof. No damage to the interior of the store and will be able to open once the water is turned back on. The gas will be pinned off at the meter due to not able to get on the roof due to not able to find a ladder to the roof to check the gas packs on the roof for the line test. The water heater was left off due to lacking water at this time due to off at the back flow device. Had 2-semi trailers on site used for storage and the door has burn damage and did not enter the semi trailers. Does have issues with the electrical panel with not having the proper clearance. Did go over that the items being stored in front of the panels need to be moved and not placed in those areas to have the proper clearance at all times. Some shelving will need to be moved due to blocking access to the panel with fuses for the compactor. The fire department was called back to the site due to had smoke coming out and not able to find a hose with water in the area. The electician showed and removed the breakers that were tripped. Sabino Electric did the work. A plumber showed to have the water turned back on. A mechanical contractor showed to check the units due to were lacking water to the chiller units for the freezers and the refrigerators. RV. |
05/28/2019 | INSP - FOLLOW UP CODE ENFORCE | GOODMAN | Approved | FOLLOW UP INSPECTION IS AS FOLLOWS: >TRASH AND DEBRIS IN THE AREA OF THE FIRE AND BEHIND THE STORE HAD BEEN REMOVED. >FIRE DAMAGE COMPACTOR HAD BEEN REPLACED WITH A USED, REBUILT COMPACTOR. >GAS HAD BEEN RESTORED TO THE STRUCTURE. >BACK FLOW HAD BEEN CHECKED BUT NOT LEAKING WATER AT THE TIME OF INSPECTION. >THE 3 PHASE ELECTRICAL PANELS INSIDE THE STORE HAD BEEN CLEARED FREE OF ALL DEBRIS AND CARTS ETC... >PANEL BELOW SHELVING WAS ALSO CLEARED. EXPLAINED TO THE MANAGER TONY THAT THESE AREAS NEED TO REMAIN CLEAR AT ALL TIMES. >ALL CLEAN UP WAS COMPLETED. COMPLIANCE / CLOSE CASE. |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T19DV03434
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
Date | Name |
04/28/2019 | NOTICE OF VIOLATION ISSUED |
04/28/2019 | STRUCTURE SECURED BY ??? |