Case: T19DV02639
Case Details
Entered Date:
04/07/2019
Applicant:
STAYBRIDGE SUITES
Description:
COMMUNICATION CALLED THAT T.F.D. ON SITE WITH A BUILDING FIRE, F190960232
Completed Inspections
Case Status: COMPLIAN
Case Number: T19DV02639
Case Description: EMERGENCY
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2019 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | Communication called that T.F.D. was on site with a building fire. Arrived and and the unit was ready to clear the site. The fire was in a kitchenette area where someone was cooking and had a fire and went to the sink to put the fire out. The fire flashed and set the sprinkler head off and flooded the unit. This unit was on the 3rd floor and went down to the first floor. The water did go into the hallway and some of the employees rooms. The water was approx. 3" in height. The toilet was removed by T.F.D. and the water was pushed into the drain to place the water in the drainage system. The occupants were removed to another room. The manager was on site and signed the paperwork. Once the extraction is completed, the management will lock the door. The company came to the site to have the sprinkler head replaced and put the fire system back on line. The fire panel was showing a trouble light and was due to the smoke detector was off at this time due to had water in it. The smoke detector will be replace in the morning. The manager will call the company once the smoke detector is replaced and the panel should reset. Will check the unit in the daylight time for other damage. RV. |
| 04/07/2019 | INSP - FOLLOW UP CODE ENFORCE | VIDAL | Approved | The water has been extracted and has blowers and a humidifier. No other damage has occured. The owner was on site and walked the unit and was advised that the contractor needs to check if a permit is required or not. The fire panel has no trouble light on at this time at the front counter area. At this time the case will be closed. Violation Abated, Close Case. RV. |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T19DV02639
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
| Date | Name |
| 04/07/2019 | NOTICE OF VIOLATION ISSUED |
| 04/09/2019 | VIOLATION CLOSED |
| 04/07/2019 | STRUCTURE SECURED BY ??? |