Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

FIRE AT COMMERCIAL BUILDING
Address:

Entered Date:

01/16/2019

Applicant:

BP SWAN INVESTORS LLC: STAT AGENT: MENDELSOHN OSERAN & SPENCER

Description:

BUILDING FIRE UNIT 3

Completed Inspections

Case Status: COMPLIAN
Case Number: T19DV00278
Case Description: FIRE AT COMMERCIAL BUILDING
Total Completed Inspections - 2
End Date Description Inspector Results Comments
01/16/2019 INSP - INITIAL CODE ENFORCMENT VALDEZ Approved EMERGENCY CALL OUT BY TFD: BUILDING FIRE TO BUILDING NUMBER 3. FIRE INVESTIGATOR ONSITE. NO ACCESS TO INTERIOR AT THIS TIME. TEP STATED THE PRIMARY FEEDERS HAVE BEEN DISCONNECTED TO THE PROPERTY. LATER TEP CAME BACK AND DISCONNECTED POWER TO THE STREET LIGHTS INSIDE THE PROPERTY. THERE IS FIRE DAMAGE TO THE SOUTHERN PART OF THE BUILDING, THIS BUILDING WAS VACANT BUT OCCUPIED BY TRANSIENTS WHICH WERE RUNNING MULTIPLE CORDS FROM THE STREET LIGHT POLE TO THE BUILDING. THE BUILDING DAMAGED AREAS ARE AS FOLLOWS: THE SOUTH END OF THE BUILDING HAS DAMAGE TO THE CEILING WOOD MEMBERS AND THE WALL AND CEILING COVERING SUCH AS SHEETROCK / CONCRETE WALL, THERE IS ONE TRUSS WITH FIRE DAMAGE. THE BUILDING HAS MULTIPLE BROKEN OR MISSING WINDOWS. THE STEEL DOORS AND FRAME HAVE HEAT DAMAGE, THERE ARE MULTIPLE BATHROOMS IN THE BUILDING WITH SHEETROCK DAMAGE AND SEVERE SMOKE DAMAGE. THERE ARE BARE AND BURNT WIRING IN THE FIRE DAMAGED AREAS, THE REST OF THE BUILDING HAS HAD THE WIRING AND DEVICES CANNIBALIZED ALONG WITH MECHANICAL EQUIPMENT (HVAC) THE WATER HEATER IS UNSERVICEABLE AND APPEARS DAMAGED. THE OWNERS CREW IS ONSITE TO SECURE THE BUILDING BY BOARDING. WILL RETURN TOMORROW CHECK ON THE BOARDING.
01/17/2019 INSP - FOLLOW UP CODE ENFORCE VALDEZ Approved BUILDING 3 WAS SECURED BY BOARDING, ALL DOCUMENTS AND PHOTOS IN SIRE, CLOSE CASE

Completed Activity Special Conditions

Case Description - FIRE AT COMMERCIAL BUILDING
Case Number - T19DV00278
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 6
Date Name
01/16/2019 CONTACTED BY PHONE
01/16/2019 CONTACTED IN PERSON
01/17/2019 CONTACTED BY MAILING
01/16/2019 NOTICE AND ORDER ISSUED
01/17/2019 VIOLATION CLOSED
01/16/2019 CALLBACK

Documents

File Name Document Type  
20190116_135003.JPG DOCUMENTS VIEW
20190116_135008.JPG DOCUMENTS VIEW
20190116_135013.JPG DOCUMENTS VIEW
20190116_135024.JPG DOCUMENTS VIEW
20190116_135039.JPG DOCUMENTS VIEW
20190116_135044.JPG DOCUMENTS VIEW
20190116_135059.JPG DOCUMENTS VIEW
20190116_135105.JPG DOCUMENTS VIEW
20190116_135112.JPG DOCUMENTS VIEW
20190116_135131.JPG DOCUMENTS VIEW
20190116_135218.JPG DOCUMENTS VIEW
20190116_135304.JPG DOCUMENTS VIEW
20190116_135308.JPG DOCUMENTS VIEW
20190116_135321.JPG DOCUMENTS VIEW
20190116_135437.JPG DOCUMENTS VIEW
20190116_135441.JPG DOCUMENTS VIEW
20190116_135508.JPG DOCUMENTS VIEW
20190116_135904.JPG DOCUMENTS VIEW
20190116_135909.JPG DOCUMENTS VIEW
20190116_135936.JPG DOCUMENTS VIEW
20190116_140009.JPG DOCUMENTS VIEW
20190116_140037.JPG DOCUMENTS VIEW
20190116_140043.JPG DOCUMENTS VIEW
4710 NOV.PDF DOCUMENTS VIEW
20190117_104311.JPG DOCUMENTS VIEW
20190117_104342.JPG DOCUMENTS VIEW
20190117_104419.JPG DOCUMENTS VIEW
20190117_104427.JPG DOCUMENTS VIEW