Case: T19DV00067
Case Details
Entered Date:
01/04/2019
Applicant:
ARBOR VILLAS APARTMENTS LLC
Description:
APT #40 NO HOT WATER FOR 1 WEEK - SEVERAL APARTMENTS IN THIS COMPLEX
Completed Inspections
Case Status: NOVERIFY
Case Number: T19DV00067
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/14/2019 | INSP - INITIAL CODE ENFORCMENT | VINDIOLA | Approved | 01/14/2019 - Arrived on site and met with manager Danielle and Maint Supervisor Rick. States on Saturday 01/12/19 a Temporary Pex line was run from the boiler to the 5 buildings to supply hot water. Line was run on the ground, then from building to building on top of the roof line. Work was done by Samsung Plumbing. Research found no permit was pulled for the temporary line. Made contact with M. Romero was asked to do an NOV for the temporary line and for work to be done to re-establish the hot water line a permanent basis to all 5 buildings. NOV was signed by manager Danielle |
03/12/2019 | INSP - FOLLOW UP CODE ENFORCE | VINDIOLA | Approved | Arrived on site to find the set up still the same at this location for the PEX water lines all is still working getting hot water to all building effected. They have gone into PDSD already and are working within the system. Will follow up on 04/12/19 |
Completed Activity Special Conditions
Case Description - RES: MINIMUM HOUSING
Case Number - T19DV00067
Case Status: NOVERIFY
Total Completed Case Activity Conditions: 2
Date | Name |
01/10/2019 | CONTACTED BY PHONE |
11/26/2019 | VIOLATION CLOSED |