Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T19DV00067
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/14/2019 | INSP - INITIAL CODE ENFORCMENT | Approved | 01/14/2019 - Arrived on site and met with manager Danielle and Maint Supervisor Rick. States on Saturday 01/12/19 a Temporary Pex line was run from the boiler to the 5 buildings to supply hot water. Line was run on the ground, then from building to building on top of the roof line. Work was done by Samsung Plumbing. Research found no permit was pulled for the temporary line. Made contact with M. Romero was asked to do an NOV for the temporary line and for work to be done to re-establish the hot water line a permanent basis to all 5 buildings. NOV was signed by manager Danielle |