Case: T18DV08151
Case Details
Entered Date:
12/19/2018
Applicant:
STATE OF ARIZONA
Description:
TFD ON SITE - BUSINESS FIRE INSPECTORS, UNIT UNDER RENOVATIONS. REQUESTING AN INSPECTOR TO REVIEW ELECTRICAL WORK BEING DONE
Case Violations
Case Number: T18DV08151
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Violations: 4
Violation Date | Code Statue |
---|---|
12/20/2018 | T.C. Ch. 16, Sec. 16-11(c) ELECTRICAL SYSTEM. (1) All dwellings and dwelling units shall be provided with electrical service. Electrical facilities connected to or in any building or structure are to be maintained hazard-free and in a state of good repair. The electrical system shall be free from such hazards as bare wiring; overloaded circuits or services; equipment not properly grounded; over-fused circuits; misuse of wiring, including the use of extension cords in lieu of permanent wiring; non-approved wiring; and wiring exposed to moisture or extreme heat. Broken, loose, frayed, inoperable, defective or missing portions of the electrical service, lines, switches, outlets, fixtures and fixture coverings shall be repaired or replaced. (2) All electrical equipment, wiring and appliances shall be installed and maintained in a safe manner and in accordance with all applicable laws. |
12/20/2018 | T.C. Ch. 16, Sec. 16-11(d) MECHANICAL EQUIPMENT. All mechanical equipment and appliances shall be properly installed, maintained in a safe, working, operating condition, and shall be free of any defect that impairs operability. |
12/20/2018 | T.C. Ch. 16, Sec. 16-11(e) PLUMBING SYSTEMS. (1) Dwelling units shall be provided with one or more bathrooms equipped with a water closet, lavatory, and either a bathtub or shower. The number of water closets and lavatories for commercial buildings shall be determined by the International Building Code based on the use of the building. Each sink, bathtub and shower shall have hot and cold running water as necessary for its normal operation and use. |
12/20/2018 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Completed Inspections
Case Status: COMPLIAN
Case Number: T18DV08151
Case Description: EMERGENCY
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2018 | INSP - INITIAL CODE ENFORCMENT | HOLLANDER | Approved | Met With TFD, ADOT and property manager. Found new walls added, new toilet with sump ejection system and new Pex lines for water.There is an exhaust system installed in the bathroom. One evap cooler is sitting on the interior floor and one routed outside. Found no heat present. Found new electric and lights. New M/C cables ran and not supported correctly. There is a new wall running the entire length of the floor from north to south. A suite is occupied without egress directly to the exterior. They must pass through the larger space. |
12/20/2018 | INSP - FOLLOW UP CODE ENFORCE | HOLLANDER | Approved | Researched for last floor plan and was not able to find the additions to the basment floor. Last electrical pages defers the lighting with no plans for installation |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T18DV08151
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
Date | Name |
12/21/2018 | CONTACTED BY EMAIL |
12/21/2018 | NOTICE OF VIOLATION ISSUED |
03/26/2020 | VIOLATION CLOSED |