Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T17DV02180
Case Details
Entered Date:
05/26/2017
Applicant:
ALVERNON NORTH LLC
Description:
COMMUNICATION CALLED THAT T.F.D. ON SITE WITH AN APARTMENT FIRE, F171460005
Outstanding Inspections
Case Number: T17DV02180
Case Status: COMPLIAN
Case Description: FIRE AT COMMERCIAL BUILDING
Total Outstanding Inspections - 15
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/19/2017 | EMERGENCY CALL OUT | VIDAL | Item closed | |
06/19/2017 | NPO(EL)-MAIN/PANEL/SUB/DISCONT | VIDAL | Item closed | |
06/19/2017 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | VIDAL | Item closed | |
06/19/2017 | NPO(PL)-PLUMBING SYSTEM & FX | VIDAL | Item closed | |
06/19/2017 | NPO(PL)-GAS SUPPLY/CONNECT | VIDAL | Item closed | |
06/19/2017 | NPO(PL)-WATER HEATERS | VIDAL | Item closed | |
06/19/2017 | NPO(HC)-COOLING | VIDAL | Item closed | |
06/19/2017 | NPO(HC)-HEATING & VENTILATION | VIDAL | Item closed | |
06/19/2017 | NPO - INSECTS/PESTS | VIDAL | Item closed | |
06/19/2017 | NPO - EGRESS | VIDAL | Item closed | |
06/19/2017 | NPO - SMOKE ALARMS | VIDAL | Item closed | |
06/19/2017 | NPO - OTHER | VIDAL | Item closed | |
06/19/2017 | NPO - EXT. BUILDING MAINTENANC | VIDAL | Item closed | |
06/19/2017 | NPO - WORK WITHOUT PERMIT | VIDAL | Item closed | |
06/19/2017 | NPO - INT. BUILDING MAINTENANC | VIDAL | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T17DV02180
Case Description: FIRE AT COMMERCIAL BUILDING
Total Completed Inspections - 3
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/26/2017 | INSP - INITIAL CODE ENFORCMENT | HOLLANDER | Approved | Visited the site to try to determine how electric is fed to the building. This building has been installed with the old feed thru panels. It appears that the first panel has multiple taps for additional feeds to pass thru to the other units as per oringinal design. An Electrical Contractor will be needed to isolate the pass thrus's to be able to reenergize the unaffected units. Spoke to the owner and he will have the contractor call us. Owners electrician is on site doing the isolation taps. |
05/26/2017 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | Received call from communication that T.F.D. on site with a apartment fire. Arrived and the units are still in the process of finding hot spots and doing the overhaul. The fire was on a upper unit and the water was going through the ceiling and flooding the unit. The fire started in the bedroom and went through the bathroom and started going into the livingroom. The unit has heavy smoke damage holes in the drywall in walls and ceilings to check for fire, a vent hole was cut in the roof and has trusses that will need to be check when cutting, the electrical was removed at the switch gear due to not able to find a panel to the unit. Did have a panel for the unit and not able to turn that off. The gas was turned off due to has a water heater in the attic area and not able to get to it and check and not sure what type of pilot the water heater has. The gas meter was pinned and once the water heater is checked, the gas can be turned back on. The unit has been condemned due to the fire damage and lacking utilities. The management is securing the unit. The fire units were called to the site due to finding smoke coming from the closet area and going into the attic area. Did do the posting of Do Not Enter and the manager signed the paperwork. The tenant was taken to the hospital and the kids are with another tenant on the property. While leaving the site the Redcross came to the site to check the unit that burned. Did have to call the police department to the site twice due to incidents on the property with people not living on the property. The manager will call when they get a hold of the electrician. Will check in 45 days RV. |
06/19/2017 | INSP - FOLLOW UP CODE ENFORCE | VIDAL | Approved | Work is being done and going to start the abatement for the abestos today. The barrier is being set up for the containment area for the unit. Did meet with the manager and as soon and the clearance is given for the abatement, the remodel will start. The unit has been kept secured and vacant and will be maintained with the contractor until the work is completed. The permit has been issued, T17CM04695 on 6-19-17 and no inspection have been done. At this time the case will be closed due to the permit has been issued. Violation Abated, Close Case. RV. |
Completed Activity Special Conditions
Case Description - FIRE AT COMMERCIAL BUILDING
Case Number - T17DV02180
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
Date | Name |
05/26/2017 | NOTICE OF VIOLATION ISSUED |
06/19/2017 | VIOLATION CLOSED |
05/26/2017 | STRUCTURE SECURED BY ??? |