COMMUNICATION CALLED THAT T.P.D. ON SITE WITH A ROOF COLLAPASED, 1611170365
Outstanding Inspections
Case Number: T16DV07865
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Outstanding Inspections - 9
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/22/2016 | EMERGENCY CALL OUT | VIDAL | Follow-up inspection | |
12/22/2016 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | VIDAL | Follow-up inspection | |
12/22/2016 | NPO(PL)-PLUMBING SYSTEM & FX | VIDAL | Follow-up inspection | |
12/22/2016 | NPO(PL)-GAS SUPPLY/CONNECT | VIDAL | Follow-up inspection | |
12/22/2016 | NPO - SMOKE ALARMS | VIDAL | Follow-up inspection | |
12/22/2016 | NPO - OTHER | VIDAL | Follow-up inspection | |
12/22/2016 | NPO - EXT. BUILDING MAINTENANC | VIDAL | Follow-up inspection | |
12/22/2016 | NPO - WORK WITHOUT PERMIT | VIDAL | Follow-up inspection | |
12/22/2016 | NPO - INT. BUILDING MAINTENANC | VIDAL | Follow-up inspection |
Completed Inspections
Case Status: COMPLIAN
Case Number: T16DV07865
Case Description: EMERGENCY
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/17/2016 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | Received call from Rick Saldate the supervisor that T.P.D. on site with a collasped ceiling. Arrived and T.P.D. was on site to do a wellfare check on the unit. When they arrive the unit was opened and no tenant in the unit. They talk to some of the tenants and they has not seen her in a few weeks. The ceilings were falling due to the roof leaking. This was in several areas and in the hallway has a plastic container catching water leaking from the cooler. Did go on the roof and the roof is lacking roof coating where the roof drains into scuppers. No smoke detectors and some of the windows are not able to lock. The maintenance was on site and had him secure a electrical conduit to the wall that was loose for the light fixture. While on site the owner did show and went over the that the tenant has not been seen for some time. He did state that she does leave for period of time with family members. Did ask the owner to have the unit secured and he will have the unit secured. The owner did sign all the paper work. Did let the owner know that the unit needs to be kept vacant until the unit is inspected for min. housing condition. Will check in 30 days. RV. |
12/22/2016 | INSP - FOLLOW UP CODE ENFORCE | VIDAL | Approved | The unit is almost done and needing some correction. Showed what needed to be done and will address in a few days. Will check in 10 days. RV. |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T16DV07865
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
Date | Name |
12/12/2016 | NOTICE OF VIOLATION ISSUED |