Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

FIRE AT COMMERCIAL BUILDING

Entered Date:

05/25/2016

Applicant:

PRIME TANQUE VERDE LLC MAIN FLOOR

Description:

COMMERCIAL FIRE

Outstanding Inspections

Case Number: T16DV03108
Case Status: COMPLIAN
Case Description: FIRE AT COMMERCIAL BUILDING
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
08/16/2016 NPO - WORK WITHOUT PERMIT VIDAL Item closed

Completed Inspections

Case Status: COMPLIAN
Case Number: T16DV03108
Case Description: FIRE AT COMMERCIAL BUILDING
Total Completed Inspections - 2
End Date Description Inspector Results Comments
05/25/2016 INSP - INITIAL CODE ENFORCMENT NAVARRO Approved vISITED SITE, MET tfd ON SITE, INSPECTED, FOUND AS FOLLOWS: 1: FIRE ON PORCH 2)FLOOR JOISTS WERE DAMAGED 3) STUCCO DAMAGED 4) SHEETROCK DAMAGED INSIDE BUILDING 5) MET MANAGER ON SITE 6) WROTE NOTICE OF VIOLATION ON SITE 7) HAD MANAGER SIGN 8) GAVE COPY OF NOTICE OF VIOLATION 9) EXPLAINED PROCESS 10) POWER WAS TURNED OFF AT BREAKER, EXPLAINED TO MANAGER HIS RESPONSEABILITIE TO TURN POWER ON AND SECURE UNIT 11) NO ELECTRICAL,HVAC,WATER OR GAS DAMAGE- ALL UTILITIES REMAIN ON. 12) FOLLOW UP IN SIXTY DAYS
08/16/2016 INSP - FOLLOW UP CODE ENFORCE VIDAL Approved The fire was on the bottom unit and was started with a grill fire on the porch. The upper deck was damaged with the stucco on the bottom. The sliding glass door and window to the living room area by the front door was broken during the fire. The sliding glass door has been replaced with new, the upper deck has all been replaced with new and like for like. The damage stucco has been removed and the foam is being installed to do the stucco repairs. Some drywall has been removed in the living room area where the fire fighters made holes in the wall to check for fire. Did not find a permit and met with the manager and she called the contractor to talk to. Did advise that a permit is required and was written on the Notice of Violation and the manager made a copy and sent it to the contractor. Will go back to the office to check with pictures if the permit is required or not. Will call the contractor back. Will check in 10 days. RV.

Completed Activity Special Conditions

Case Description - FIRE AT COMMERCIAL BUILDING
Case Number - T16DV03108
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 7
Date Name
08/16/2016 CONTACTED BY PHONE
05/26/2016 CONTACTED IN PERSON
05/26/2016 CONTACTED BY MAILING
08/16/2016 CONTACTED BY EMAIL
05/26/2016 NOTICE OF VIOLATION ISSUED
11/14/2016 VIOLATION CLOSED
08/16/2016 RESEARCH

Documents

File Name Document Type  
20160526090725887.PDF DOCUMENTS VIEW