Status:

COMPLIAN

Type:

RESIDENTIAL FIRE
Address:

Entered Date:

09/25/2015

Applicant:

MC LEAN W JOHN

Description:

RESIDENTIAL FIRE

Case Violations

Case Number: T15DV07103
Case Status: COMPLIAN
Case Description: RESIDENTIAL FIRE
Total Violations: 1
Violation Date Code Statue
11/03/2015 REINSP FEE - WAIVED

Outstanding Inspections

Case Number: T15DV07103
Case Status: COMPLIAN
Case Description: RESIDENTIAL FIRE
Total Outstanding Inspections - 6
End Date Description Inspector Results Comments
10/11/2016 NPO(EL)-MAIN/PANEL/SUB/DISCONT BIGMAN Item closed
10/11/2016 NPO(EL)-WIRING/SWITCH/OUTLT/FX BIGMAN Item closed
10/11/2016 NPO(DL)-DILAPIDATED STRUCTURE BIGMAN Item closed
10/11/2016 NPO - INSECTS/PESTS BIGMAN Item closed
10/11/2016 NPO - EXT. BUILDING MAINTENANC BIGMAN Item closed
10/11/2016 NPO - INT. BUILDING MAINTENANC BIGMAN Item closed

Completed Inspections

Case Status: COMPLIAN
Case Number: T15DV07103
Case Description: RESIDENTIAL FIRE
Total Completed Inspections - 2
End Date Description Inspector Results Comments
09/21/2015 INSP - INITIAL CODE ENFORCMENT NAVARRO Approved Visited site, met Tucson Fire at site, inspected, found as follows, there was alot of fire and smoke damage thru out the residence and the carport, and shed, there was a fire initiated due to the added illegal electrical circuits added.Upon furthur inspection found illegal electric circuits added thru out the residence,additions,sheds, also found an installation of a water heater that was installed illegally and posed a safety hazard, there was free flowing water coming from the water heater that the water piping was damaged due to the fire, I then asked the tenant where the water meter was and was shown and the water was turned off,Tucson Electric Power had booted the power lugs on the electrical mechaniclal meter, South west gas made a determination that the added gas line was unsafe and had pinned the gas meter in the off position, The Red Cross was contacted thru the Tucson Fire due to the reidence was going to be condemned due to no utilitys.I then contacted owner and explained to him that the unit would be condemned, owner refusing to leave premises and stated that no one could make him leave, wrote notice of violation, had owner sign and gave a copy.I then took pictures, then contacted the board up company to have the unit secured, they had pinned both entry doors closed.posted "DO NOT ENTER"
10/11/2016 INSP - FOLLOW UP CODE ENFORCE BIGMAN Approved MET WITH SUPERVISOR. ADVISED TO CLOSE OUT CASE. OWNER HAS HIRED AN ARCHICT/CONTRACTOR TO COMPLETE PROJECT. PERMIT IS IN ISSUED STATUS.

Completed Activity Special Conditions

Case Description - RESIDENTIAL FIRE
Case Number - T15DV07103
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 6
Date Name
02/04/2016 CONTACTED BY PHONE
09/30/2015 CONTACTED IN PERSON
09/30/2015 NOTICE OF VIOLATION ISSUED
10/20/2016 VIOLATION CLOSED
11/03/2015 SEC LETTER OF BILLING FOR $??? SENT TO OWNERS
09/25/2015 STRUCTURE SECURED BY ???

Documents

File Name Document Type  
20150919_234745WALNUT.JPG LETTER OF COMPLETION VIEW
20150919_234751WALNUT.JPG LETTER OF COMPLETION VIEW
20150919_234816WALNUT.JPG LETTER OF COMPLETION VIEW
20150920_085943WALNUT.JPG LETTER OF COMPLETION VIEW
20150920_085946WALNUT.JPG LETTER OF COMPLETION VIEW
20150920_085947WALNUT.JPG LETTER OF COMPLETION VIEW
20150920_085951WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_023935WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_023939WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_023942WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_023950WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_023957WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024002WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024028WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024032WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024039WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024043WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024106WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024109WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024114WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024121WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024150WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024154WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024201WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024213WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024220WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024225WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024229WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024236(0)WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024236WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024244WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024247WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024256WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024258WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024300WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024342WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024344WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024349WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024351WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024357WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024401WALNT.JPG LETTER OF COMPLETION VIEW
20150921_024403WALNUT.JPG LETTER OF COMPLETION VIEW
20150921_024405WALNUT.JPG LETTER OF COMPLETION VIEW
PART_1443200522308_20150921_024017WALNUT.JPG LETTER OF COMPLETION VIEW
PART_1443200524847_20150921_024018WALNUT.JPG LETTER OF COMPLETION VIEW