Case Details

Status:

COMPLIAN

Type:

WORK WITHOUT PERMITS-RESIDENTL
Address:

Entered Date:

07/27/2015

Applicant:

GREG M GIBSON

Description:

WORK WITHOUT PERMITS. REAR PORCH AND FIREPLACE BUILT WITHOUT PERMITS.

Case Violations

Case Number: T15DV05531
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Violations: 5
Violation Date Code Statue
08/24/2015 UDC, Sec. 10.2.3. COMPLIANCE REVIEW, EXISTING DEVELOPMENT Any land used or occupied; any site improvement, modification, or construction started; any existing use or structure expanded, reconstructed, changed, or otherwise altered; and any land divided into multiple parcels without certification of compliance with the provisions of the UDC through a zoning review process is considered a violation of the UDC. Enforcement of violations shall be in accordance with Section 10.4, Penalties and Remedies.
08/24/2015 UDC Sec. 10.2.1. COMPLIANCE REVIEW, PROPOSED DEVELOPMENT No land may be used or occupied; no site improvement, modification, or construction started; no existing use or structure expanded, reconstructed, changed, or otherwise altered; and no land may be divided into multiple parcels until compliance with the provisions of the UDC has been certified through a zoning review process by PDSD. No City agency may issue a permit for excavation, grubbing, grading, paving, demolition, or construction of any sort before certification of compliance with provisions of the UDC has been determined by PDSD. In the event a zoning regulation requires interpretation, such interpretation shall be issued by the Zoning Administrator in accordance with Sections 1.5, Interpretations of the Unified Development Code.
08/24/2015 UDC, Sec. 10.3.5. VIOLATION OF A SITE PLAN Failure to comply with conditions placed on an approved site plan shall constitute a violation of the UDC.
08/24/2015 UDC, Sec. 10.3.4. VIOLATION OF CONDITIONS OF APPROVAL Failure to comply with the requirements or conditions of approval on any of the various zoning compliance procedures as provided by the UDC, such as, but not limited to, Special Exception, Design Development Option, Temporary Use, or Home Occupation procedures, constitutes a violation of the UDC.
08/24/2015 T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe.

Outstanding Inspections

Case Number: T15DV05531
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
10/13/2015 NPO - WORK WITHOUT PERMIT NAVARRO Citation

Completed Inspections

Case Status: COMPLIAN
Case Number: T15DV05531
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
End Date Description Inspector Results Comments
08/21/2015 INSP - INITIAL CODE ENFORCMENT NAVARRO Approved Visited site, inspected, found porch added in rearwill research.
11/24/2015 INSP - FOLLOW UP CODE ENFORCE NAVARRO Approved owner has a arraignment hearing set

Completed Activity Special Conditions

Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T15DV05531
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 7
Date Name
07/14/2016 CONTACTED BY PHONE
08/25/2015 CONTACTED BY MAILING
08/25/2015 NOTICE OF VIOLATION ISSUED
10/16/2015 CITATION ISSUED
10/05/2016 VIOLATION CLOSED
10/16/2015 COURT HEARING INFO
08/24/2015 RESEARCH

Documents

File Name Document Type  
20150825085536703.PDF DOCUMENTS VIEW
20151016140200905.PDF DOCUMENTS VIEW