Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

CAR THROUGH COMMERCIAL BUILDIN

Entered Date:

05/04/2015

Applicant:

26 PALMS DELAWARE LLC & SIERRA INDUSTRIAL PARK DELAWARE LLC

Description:

CAR INTO BUILDING

Outstanding Inspections

Case Number: T15DV03376
Case Status: COMPLIAN
Case Description: CAR THROUGH COMMERCIAL BUILDIN
Total Outstanding Inspections - 6
End Date Description Inspector Results Comments
12/11/2015 NPO(EL)-WIRING/SWITCH/OUTLT/FX FLORES Extension granted
12/11/2015 NPO(PL)-PLUMBING SYSTEM & FX FLORES Extension granted
12/11/2015 NPO - OTHER FLORES Extension granted
12/11/2015 NPO - EXT. BUILDING MAINTENANC FLORES Extension granted
12/11/2015 NPO - WORK WITHOUT PERMIT FLORES Extension granted
12/11/2015 NPO - INT. BUILDING MAINTENANC FLORES Extension granted

Completed Inspections

Case Status: COMPLIAN
Case Number: T15DV03376
Case Description: CAR THROUGH COMMERCIAL BUILDIN
Total Completed Inspections - 2
End Date Description Inspector Results Comments
05/04/2015 INSP - INITIAL CODE ENFORCMENT VIDAL Approved Received call from Rick Mendoza that T.P.D. on site with a car through building. Arrived and T.P.D. have cleared the site and the maintenance supervisor was on site. The vehicle hit the east wall of a storage room that has been added to the rear of the main structure. The exterior wall has been pushed down on the east side. The hose bibb has been broken off and capped for now to get the water back on. The wall where the hose bibb is locatee has been furred out and made holes on the on the panels to make the repair for sodering of the cap on a copper line. The storage room appears to not have been permited due to the stucco has been used for the exterior covering and has no vapor barrier of felt or paper, no weep screen and the rafters are 2 x 4's spaning 8' with a drywall ceiling. The maintenance man did sign the paper work and did go over the addition may have been built with out a permit and the architect will have to check when doing the drawings for the repairs. Once the cap was placed where the hose bibb was knocked off, the water was turned back on. The business was able to remain opened due to no damage to the main building. Was in the process of securing the opening when leaving the site. Will check in 30 days. RV.
12/11/2015 INSP - FOLLOW UP CODE ENFORCE VIDAL Approved No work has been done and the permit has been issued on 11-9-15. Did talk to the maintenance supervisor and hopes that the contractor will start next week and not sure what date. Will check in 45 days. RV.

Completed Activity Special Conditions

Case Description - CAR THROUGH COMMERCIAL BUILDIN
Case Number - T15DV03376
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
Date Name
05/12/2015 CONTACTED BY PHONE
05/12/2015 NOTICE OF VIOLATION ISSUED
07/21/2016 VIOLATION CLOSED
10/16/2015 RESEARCH

Documents

File Name Document Type  
20150512091637184.PDF DOCUMENTS VIEW
PICTURE 527.JPG IMAGES VIEW
PICTURE 518.JPG IMAGES VIEW
PICTURE 519.JPG IMAGES VIEW
PICTURE 520.JPG IMAGES VIEW
PICTURE 521.JPG IMAGES VIEW
PICTURE 522.JPG IMAGES VIEW
PICTURE 523.JPG IMAGES VIEW
PICTURE 524.JPG IMAGES VIEW
PICTURE 525.JPG IMAGES VIEW
PICTURE 526.JPG IMAGES VIEW