Case Details

Status:

COMPLIAN

Type:

WORK WITHOUT PERMITS-COMMERCL

Entered Date:

11/25/2014

Applicant:

PAVILIONS AT PANTANO APTS I LLC ATTN: GAINES INVESTMENT TRUST

Description:

Foot bridge between building 1 & 2 deteriorated and in need of repair.

Case Violations

Case Number: T14DV09708
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Violations: 1
Violation Date Code Statue
01/14/2015 T.C. Ch. 16, Sec. 16-14(c) BUILDINGS AND STRUCTURES CONSTITUTING A NUISANCE. All buildings and structures are to be maintained so as not to pose a threat to the health and safety of any person or persons. The condition of a building or structure that meets any or all of the following is a public nuisance, is a violation of this chapter, and subjects the building or structure to abatement as provided in Article VI of this chapter, including demolition as provided in section 16-65: (5) The building, structure, or any portion or member or appurtenance thereof is likely to fail, or to become detached or dislodged, or to partially or completely collapse and thereby injure persons or damage property.

Outstanding Inspections

Case Number: T14DV09708
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
11/25/2014 NPO - EXT. BUILDING MAINTENANC COX Item initialized

Completed Inspections

Case Status: COMPLIAN
Case Number: T14DV09708
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Completed Inspections - 2
End Date Description Inspector Results Comments
11/25/2014 INSP - INITIAL CODE ENFORCMENT COX Approved I visited the site and found a foot bridge approximately 15'-20' in length on the third floor between buildings 1 & 2 with some temporary shoring extending up from the second floor supporting the third floor bridge. I spoke with a manager in the office and she indicated they were aware of this issue and the corporate office is in the process of selecting a contractor to affect the repairs. I requested the manager have identical shoring installed from the second floor to the ground to more evenly distribute the load until repairs are complete. She stated she would begin straight away with getting the additional shoring installed. The manager stated further she would contact her corporate offices to ascertain a time estimate for the repairs to be completed. She will contact me when she obtains that information.
03/11/2015 INSP - FOLLOW UP CODE ENFORCE COX Approved Both bridges removed by licensed contractor under permit T15CM00903.

Completed Activity Special Conditions

Case Description - WORK WITHOUT PERMITS-COMMERCL
Case Number - T14DV09708
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
Date Name
02/20/2015 CONTACTED BY PHONE
01/08/2015 CONTACTED BY EMAIL
01/14/2015 NOTICE OF VIOLATION ISSUED
03/11/2015 VIOLATION CLOSED