Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

FIRE AT COMMERCIAL BUILDING

Entered Date:

09/16/2014

Applicant:

TUCSON FIVE LP

Description:

COMMUNCATION CALLED THAT T.F.D. ON SITE WITH A TREE INTO BUIILDING AND DAMAGE TO STAIRWAY

Outstanding Inspections

Case Number: T14DV07440
Case Status: COMPLIAN
Case Description: FIRE AT COMMERCIAL BUILDING
Total Outstanding Inspections - 3
End Date Description Inspector Results Comments
09/18/2014 NPO - OTHER VIDAL Follow-up inspection
09/18/2014 NPO - EXT. BUILDING MAINTENANC VIDAL Follow-up inspection
09/18/2014 NPO - WORK WITHOUT PERMIT VIDAL Follow-up inspection

Completed Inspections

Case Status: COMPLIAN
Case Number: T14DV07440
Case Description: FIRE AT COMMERCIAL BUILDING
Total Completed Inspections - 2
End Date Description Inspector Results Comments
09/13/2014 INSP - INITIAL CODE ENFORCMENT VIDAL Approved Receive a call from communication that T.F.D. on stite with people traped in the unit due to tree into the building. Arrived and the tree has fallen onto the stairway and not allowing access to the units from the ground level. The complex did have the insurance company on site and was in the process of cutting the tree to give access to the upper units. All the occupants have been removed from the units on the upper section and staying in other units or with family. The building has some damage to the stucco and the roof edge on the top of the parapet. There is no structual damage to the building other than the stairway damaged on the railings. The insurance company will be making the railing safe by straighting the rails or blocking the areas that will be removed due to the damage and not able to be straightend out. The units were posted of "Do Not Enter" until the area has been made safe to enter the upper units. The management will call when the opening has been cleared. Will check in 5 days. RV.
09/18/2014 INSP - FOLLOW UP CODE ENFORCE VIDAL Approved The tree has been removed and the railing has been secured at this time with a sheet of plywood to secure the stairway to be used. The landing and the the steps to the upper units has been damaged on the west side. The stairway is able to be used. Will check in 30 days. RV.

Completed Activity Special Conditions

Case Description - FIRE AT COMMERCIAL BUILDING
Case Number - T14DV07440
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
Date Name
09/25/2014 CONTACTED IN PERSON
09/25/2014 NOTICE AND ORDER ISSUED
09/25/2014 NOTICE OF VIOLATION ISSUED
06/16/2015 VIOLATION CLOSED

Documents

File Name Document Type  
DAMAGE REPORT AND NOTICES -7440.PDF DOCUMENTS VIEW
DSCN4854.JPG IMAGES VIEW
DSCN4820.JPG IMAGES VIEW
DSCN4821.JPG IMAGES VIEW
DSCN4822.JPG IMAGES VIEW
DSCN4823.JPG IMAGES VIEW
DSCN4824.JPG IMAGES VIEW
DSCN4825.JPG IMAGES VIEW
DSCN4826.JPG IMAGES VIEW
DSCN4827.JPG IMAGES VIEW
DSCN4828.JPG IMAGES VIEW
DSCN4829.JPG IMAGES VIEW
DSCN4830.JPG IMAGES VIEW
DSCN4831.JPG IMAGES VIEW
DSCN4832.JPG IMAGES VIEW
DSCN4849.JPG IMAGES VIEW
DSCN4850.JPG IMAGES VIEW
DSCN4851.JPG IMAGES VIEW
DSCN4852.JPG IMAGES VIEW
DSCN4853.JPG IMAGES VIEW