Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T14DV01982
Case Details
Entered Date:
03/26/2014
Applicant:
RANCHO DEL MAR APARTMENTS
Description:
CLOGGED SEWER LINE
Case Violations
Case Number: T14DV01982
Case Status: COMPLIAN
Case Description: CONDEMNATION
Total Violations: 2
Violation Date | Code Statue |
---|---|
03/26/2014 | T.C. Ch. 16, Sec. 16-11(e) PLUMBING SYSTEMS. (3) All plumbing systems are to be maintained safe and hazard free and in a state of good repair. Every dwelling or dwelling unit shall have an adequate potable water supply. Every plumbing fixture, water and waste-pipe, and gas connection shall be properly installed in accordance with all applicable laws and maintained in good and sanitary working condition so as to prevent structural deterioration or health hazards, and are to be free from leaks and obstructions. |
03/26/2014 | T.C. Ch. 16, Sec. 16-11(g) INTERIOR SANITATION. (1) The interior of every building or structure shall be maintained free from any unsafe or unsanitary accumulation of refuse. (2) All sanitary facilities shall be installed and maintained in a safe and sanitary condition. (3) Every dwelling unit must have a kitchen, which shall include a sink. Sink drain boards and countertops adjacent to the kitchen sink shall be made of non-absorbent materials, or must be covered by a non-absorbent material. |
Outstanding Inspections
Case Number: T14DV01982
Case Status: COMPLIAN
Case Description: CONDEMNATION
Total Outstanding Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/07/2014 | NPO(PL)-SEWAGE DISPOSAL (SYS) | BIGMAN | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T14DV01982
Case Description: CONDEMNATION
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/25/2014 | INSP - INITIAL CODE ENFORCMENT | NAVARRO | Approved | Visited site, inspected, found as follows, a plugged sewer line that was allowing over flow into the apartment and making the unit uninhabitable, condemned unit and talked to management to place tenants until unit was repaired and sustained habitable, will write notice of violation |
04/07/2014 | INSP - FOLLOW UP CODE ENFORCE | NAVARRO | Approved | Visited site, inspected found property in compliance case closed abated |
Completed Activity Special Conditions
Case Description - CONDEMNATION
Case Number - T14DV01982
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
Date | Name |
04/02/2014 | CONTACTED BY MAILING |
03/26/2014 | NOTICE OF VIOLATION ISSUED |
04/10/2014 | VIOLATION CLOSED |