Case: T14DV00918
Case Details
Entered Date:
02/18/2014
Applicant:
ATTN. ERIC LAYTIN
Description:
COMMERCIAL FIRE
Case Violations
Case Number: T14DV00918
Case Status: COMPLIAN
Case Description: FIRE AT COMMERCIAL BUILDING
Total Violations: 1
| Violation Date | Code Statue |
|---|---|
| 07/21/2015 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Outstanding Inspections
Case Number: T14DV00918
Case Status: COMPLIAN
Case Description: FIRE AT COMMERCIAL BUILDING
Total Outstanding Inspections - 5
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2014 | NPO(EL)-MAIN/PANEL/SUB/DISCONT | LOPEZ | Follow-up inspection | |
| 07/10/2014 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | LOPEZ | Follow-up inspection | |
| 07/10/2014 | NPO(PL)-PLUMBING SYSTEM & FX | LOPEZ | Follow-up inspection | |
| 07/10/2014 | NPO - EXT. BUILDING MAINTENANC | LOPEZ | Follow-up inspection | |
| 07/10/2014 | NPO - INT. BUILDING MAINTENANC | LOPEZ | Follow-up inspection |
Completed Inspections
Case Status: COMPLIAN
Case Number: T14DV00918
Case Description: FIRE AT COMMERCIAL BUILDING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2014 | INSP - INITIAL CODE ENFORCMENT | NAVARRO | Approved | Visited site, met TFD on site, inspected, found as follows, extensive damage in a secondary unit, Roof trusses, electrical, plumbing,walls, walboard, walls,condemned unit. Met with the owner on site, wrote notice of violation. Explained to owner the process, follow, inspection fees, extensions, citation. Stated they understood, wrote notice and had owner sign and gave a cop. Told ninety days to abate. Gave a chain to have unit secured, has a six foot fence on entire property. |
| 07/10/2014 | INSP - FOLLOW UP CODE ENFORCE | LOPEZ | Approved | Property still secured and vacant, will keep monatoring area. follow up 60 days. |
Completed Activity Special Conditions
Case Description - FIRE AT COMMERCIAL BUILDING
Case Number - T14DV00918
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 5
| Date | Name |
| 07/24/2015 | CONTACTED BY MAILING |
| 02/19/2014 | NOTICE AND ORDER ISSUED |
| 02/19/2014 | NOTICE OF VIOLATION ISSUED |
| 10/14/2016 | VIOLATION CLOSED |
| 02/18/2014 | CALLBACK |