Case Details

Status:

COMPLIAN

Type:

EMERGENCY
Address:

Entered Date:

06/03/2013

Applicant:

BRANSTETTER JOSEPH W

Description:

Building inspector requested for possible explosion

Outstanding Inspections

Case Number: T13DV03793
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Outstanding Inspections - 2
End Date Description Inspector Results Comments
INSP - FOLLOW UP CODE ENFORCE None Not Inspected
06/04/2013 NPO - OTHER DCOX Item closed

Completed Inspections

Case Status: COMPLIAN
Case Number: T13DV03793
Case Description: EMERGENCY
Total Completed Inspections - 1
End Date Description Inspector Results Comments
06/04/2013 INSP - INITIAL CODE ENFORCMENT DCOX Approved I responded to a request for service from TFD regarding a possible explosion in a townhouse. Upon arrival I found TFD and TPD investigation the explosion. It was determined that the cause of the blast was drug related and an extrapolated investigation requiring the issuance if search warrants would be necessary. There was no fire and the extent of damage was limited to some broken windows. I waited approximately 1.5 hours until TPD determined that the incident was drug related and that they would be conducting the lengthy investigation. At that point, with no structural damage and only broken windows I left the scene as TPD would ultimately have the scene secured after they concluded their investigation.

Completed Activity Special Conditions

Case Description - EMERGENCY
Case Number - T13DV03793
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 1
Date Name
06/04/2013 VIOLATION CLOSED