Case: T13DV03472
Case Details
Entered Date:
05/20/2013
Applicant:
MENESES EDUARDO G & ESTELA U JT/RS 1/2 INT
Description:
COMMERCIAL WOP
Case Violations
Case Number: T13DV03472
Case Status: COMPLIAN
Case Description: COMMERCIAL ZONING
Total Violations: 5
| Violation Date | Code Statue |
|---|---|
| 05/30/2013 | UDC, Sec. 10.3.5. VIOLATION OF A SITE PLAN Failure to comply with conditions placed on an approved site plan shall constitute a violation of the UDC. |
| 05/30/2013 | UDC, Sec. 10.2.3. COMPLIANCE REVIEW, EXISTING DEVELOPMENT Any land used or occupied; any site improvement, modification, or construction started; any existing use or structure expanded, reconstructed, changed, or otherwise altered; and any land divided into multiple parcels without certification of compliance with the provisions of the UDC through a zoning review process is considered a violation of the UDC. Enforcement of violations shall be in accordance with Section 10.4, Penalties and Remedies. |
| 05/30/2013 | UDC, Sec. 10.3.4. VIOLATION OF CONDITIONS OF APPROVAL Failure to comply with the requirements or conditions of approval on any of the various zoning compliance procedures as provided by the UDC, such as, but not limited to, Special Exception, Design Development Option, Temporary Use, or Home Occupation procedures, constitutes a violation of the UDC. |
| 05/30/2013 | UDC, Sec. 6.6.1(C). ACCESSORY USES In all zones, an accessory use shall comply with the following: C. The use shall not substantially alter the exterior appearance or character of the principal use or building to which it is incidental. |
| 05/30/2013 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Outstanding Inspections
Case Number: T13DV03472
Case Status: COMPLIAN
Case Description: COMMERCIAL ZONING
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2013 | LUC - ILLEGAL HOME OCCUPATION | WNAVARRO | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T13DV03472
Case Description: COMMERCIAL ZONING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2013 | INSP - INITIAL CODE ENFORCMENT | WNAVARRO | Approved | Visited site, inspected, found multiplemodifications to main structure, garage door installed for a new tire shop, auto body /mechanic shop being established, will write notice of violation |
| 05/31/2013 | INSP - FOLLOW UP CODE ENFORCE | WNAVARRO | Approved | Visited site, met Rick Hollader, Jim Hurd on site, inspected and found multiple violation on structure, electrical violations consited of exterior front light,paint booth has lights, recepticals, wiring methods(no seals, conduit and fittings to code),Ground fault circuit interuptor in garage, bathroom, no grounding on service entranc, unused openings at panel, panel labeling not ledgeable, compressor diconnect not code code compliant, service nipple above current not sealed and allowing water to enter, current capacity is over rated for conductor size, improper conductor terminations, junction box has splices, unused openings,, verify air ecchanges for paint booth, electrical was also added and modified from last approved site plan,also the paint booth was being established without any permits and have hazardous materials in paint shop. I then contacted supervision and went over all the safety hazards of the buiklding and the contents and was in coinsidence of condemning unit and shut down at that point, handed a notice of violation and was given sero days to abate, was required to contact development services and submit for a cretificate of occupancy along with a site plan, will follow up in thirty days |
Completed Activity Special Conditions
Case Description - COMMERCIAL ZONING
Case Number - T13DV03472
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 06/19/2013 | CONTACTED BY PHONE |
| 10/17/2013 | MENTOR ASSISTANCE |
| 10/17/2013 | VIOLATION CLOSED |
| 10/17/2013 | RESEARCH |