Case: T11DV05209
Case Details
Entered Date:
07/11/2011
Applicant:
BUSCHE AYSEL
Description:
BUILDING FIRE TO A COFFEE SHOP BUSINESS
Outstanding Inspections
Case Number: T11DV05209
Case Status: COMPLIAN
Case Description: FIRE AT COMMERCIAL BUILDING
Total Outstanding Inspections - 3
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2011 | NPO(EL)-MAIN/PANEL/SUB/DISCONT | DJOHNSTO | Follow-up inspection | |
| 09/12/2011 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | DJOHNSTO | Follow-up inspection | |
| 09/12/2011 | NPO(DL)-DILAPIDATED STRUCTURE | DJOHNSTO | Follow-up inspection |
Completed Inspections
Case Status: COMPLIAN
Case Number: T11DV05209
Case Description: FIRE AT COMMERCIAL BUILDING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2011 | INSP - INITIAL CODE ENFORCMENT | JVALDEZ | Approved | EMERGENCY CALL OUT BY TFD: COMMERCIAL BUILDING (RAGING SAGE COFFEE SHOP) FIRE DAMAGE TO THE ATTIC AREA OF THE BUILDING, FLAT TRUSSES, AND OTHER SUPPORTS TO INCLUDE ROOF SHEATHING HAVE SEVERE CRACKING AND CHARRING, THERE WAS A 4X8 ROOF CUT OUT BY TFD. INTERIOR DRYWALL DAMAGE IS ESTIMATED AT 50 SQ FT. ELECTRICAL DAMAGE TO ROMEX, FLEX CONDUIT, EMT CONDUIT IN THE ATTIC AREA. TEP WAS CALLED THEY STATED THAT METER WAS BOOTED OFF. SWG STATED GAS WAS OK. PERMITS ARE REQUIRED FOR ALL REPAIRS. PHOTOS IN SIRE, SCHEDULE A 60 DAY FOLLOW UP INSPECTION |
| 09/12/2011 | INSP - FOLLOW UP CODE ENFORCE | DJOHNSTO | Approved | Permit issued 7/13/2011. Expires 1/16/2012. Follow-up on 1/19/2012. |
Completed Activity Special Conditions
Case Description - FIRE AT COMMERCIAL BUILDING
Case Number - T11DV05209
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 7
| Date | Name |
| 07/11/2011 | CONTACTED IN PERSON |
| 07/13/2011 | CONTACTED BY MAILING |
| 07/14/2011 | CONTACTED BY EMAIL |
| 07/13/2011 | NOTICE AND ORDER ISSUED |
| 07/13/2011 | NOTICE OF VIOLATION ISSUED |
| 03/13/2012 | VIOLATION CLOSED |
| 09/12/2011 | RESEARCH |