Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

  • OnBase Document Lookup Error!

Case Details

Status:

FIELD

Type:

COMPLAINT (COMMERCIAL)

Entered Date:

07/30/2009

Applicant:

WEST MAIN GATE CENTER LLC

Description:

SPRINKLER COMPLAINT

Outstanding Inspections

Case Number: T09FR02536
Case Status: FIELD
Case Description: COMPLAINT (COMMERCIAL)
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
07/30/2009 INSP - FULL EDESCHAI Correction Required DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CCORRECTED WITHIN 30 DAYS A COPY OF THE REPAIR REPORT SHALL BE SENT TO THIS OFFICE 1) GENTLE BENS - ALCOVE BY THE NEW COOLER IS REQUIRED TO BE SPRINKLERED. CHECK THE COOLER FOR SPRINKLER INSTALLATION, INTERIOR. 2) FRONT WEST ALCOVE - A SPRINKLER HEAD IS LOCATED TO HIGH IN HARD LID CEILING 3) PRESSURE GUAGES ARE 5 YEARS OLD AND SHALL BE REPLACED OR CALIBRATED 4) THE 5 YEAR INTERNAL VALVE INSPECTION IS DUE