Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T09FR02536
Case Details
Entered Date:
07/30/2009
Applicant:
WEST MAIN GATE CENTER LLC
Description:
SPRINKLER COMPLAINT
Outstanding Inspections
Case Number: T09FR02536
Case Status: FIELD
Case Description: COMPLAINT (COMMERCIAL)
Total Outstanding Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/30/2009 | INSP - FULL | EDESCHAI | Correction Required | DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CCORRECTED WITHIN 30 DAYS A COPY OF THE REPAIR REPORT SHALL BE SENT TO THIS OFFICE 1) GENTLE BENS - ALCOVE BY THE NEW COOLER IS REQUIRED TO BE SPRINKLERED. CHECK THE COOLER FOR SPRINKLER INSTALLATION, INTERIOR. 2) FRONT WEST ALCOVE - A SPRINKLER HEAD IS LOCATED TO HIGH IN HARD LID CEILING 3) PRESSURE GUAGES ARE 5 YEARS OLD AND SHALL BE REPLACED OR CALIBRATED 4) THE 5 YEAR INTERNAL VALVE INSPECTION IS DUE |