Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Case Details

Status:

FIELD

Type:

COMPLAINT (COMMERCIAL)
Address:

Entered Date:

01/05/2009

Applicant:

PIMA WILMOT DEVELOPMENT LLC

Description:

SPRINKLER INSPECTION

Outstanding Inspections

Case Number: T09FR00018
Case Status: FIELD
Case Description: COMPLAINT (COMMERCIAL)
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
01/05/2009 INSP - FULL EDESCHAI Correction Required DURING THE ANNUAL FIRE SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE REPAIR MANIFEST SHALL BE PROVIDED THE FIRE PREVENTION OFFICE 1) PROVIDE SIGNAGE FOR THE INSPECTORS TEST AND MAIN DRAIN 2) PROVIDE A LOCK AND CHAIN FOR THE MAIN CONTROL VALVE 3) SUITE # 4 - WATER HEATER CLOSET - A CEILING HAS NOT BEEN INSTALLED IN THIS ROOM. A HEAT COLLECTION DEVICE SHALL BE PROVIDED OR THE SPRINKLER SHALL BE RAISED TO THE CORRECT POSITION