Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T09FR00018
Case Details
Entered Date:
01/05/2009
Applicant:
PIMA WILMOT DEVELOPMENT LLC
Description:
SPRINKLER INSPECTION
Outstanding Inspections
Case Number: T09FR00018
Case Status: FIELD
Case Description: COMPLAINT (COMMERCIAL)
Total Outstanding Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/05/2009 | INSP - FULL | EDESCHAI | Correction Required | DURING THE ANNUAL FIRE SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE REPAIR MANIFEST SHALL BE PROVIDED THE FIRE PREVENTION OFFICE 1) PROVIDE SIGNAGE FOR THE INSPECTORS TEST AND MAIN DRAIN 2) PROVIDE A LOCK AND CHAIN FOR THE MAIN CONTROL VALVE 3) SUITE # 4 - WATER HEATER CLOSET - A CEILING HAS NOT BEEN INSTALLED IN THIS ROOM. A HEAT COLLECTION DEVICE SHALL BE PROVIDED OR THE SPRINKLER SHALL BE RAISED TO THE CORRECT POSITION |