Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

FIELD

Type:

COMPLAINT (COMMERCIAL)
Address:

Entered Date:

12/02/2008

Applicant:

BLAKE ROBERT E & DEBORAH L CP/RS

Description:

SPRINKLER INSPECTION

Completed Inspections

Case Status: FIELD
Case Number: T08FR04533
Case Description: COMPLAINT (COMMERCIAL)
Total Completed Inspections - 1
End Date Description Inspector Results Comments
12/02/2008 INSP - FULL EDESCHAI Approved DURING THE ANNUAL FIRE SPRINKLER INSPECTION, 11-5-08, THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE REPAIR MANIFEST SHALL BE FORWARDED TO THE FIRE PREVENTION OFFICE. 1) THE 3/4" X 5" NIPPLE AT THE ALARM VALVE THAT IS LEAKING AND RUSTED SHALL BE CHANGED OUT 2) THE SPARE HEAD BOX NEEDS A WRENCH TO FIT THE STAR-E AND STAR LD2 SPRINKLERS 3) THE SPARE HEAD BOX NEEDS 2 VERTICLE SIDEWALLS 4) AT THE EAST DANCE FLOOR THERE ARE 2 SPRINKLERS TO CLOSE TOGETHER. ONE MAY BE REMOVED OR A BAFFEL MAY BE USED 5) A SPRINKLER HEAD GUARD SHALL BE SUPPLIED AT THE ENTRY, DANCE FLOOR EAST, TO THE LADIES DRESSING ROOM, IF THE SPRINKLER IS LOWER THAN 6' 6) CHANGE OUT THE OLD STYLE SPRINKLER IN THE MANAGERS OFFICE TO COINCIDE WITH THE INSTALLED SPRINKLERS 7) THE DROP IN THE STORE ROOM NEXT TO THE STEPS NEEDS TO BE SEALED AT THE CEILING PENETRATION