Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Case Details

Status:

COMPLETE

Type:

INSPECTION
Address:

Entered Date:

11/07/2008

Applicant:

CITY OF TUCSON

Description:

Fire Sprinkler Inspection Issues

Outstanding Inspections

Case Number: T08FR04254
Case Status: COMPLETE
Case Description: INSPECTION
Total Outstanding Inspections - 2
End Date Description Inspector Results Comments
11/07/2008 INSP - FULL GDAURIA Correction Required Sprinkler system deficiencies per Kazal report #088245 dated 5/28/08
11/07/2008 VIOL - FIRE PROTECTION SYSTEMS GDAURIA Violation 903.5 Testing and maintenance. Sprinkler systems shall be tested and maintained. Deficiencies per report # 088245 (attached) *Head replacement and water gong repair to be done w/in 2 weeks. *All other items to be completed w/in 30 days. 1. Replace any sprinkler which has been painted (40-50) 2. Repair water gongs @ zones 23, 24 & 35 3. Replace all noted Omega heads (recalled) in lobby and exterior canopy (51) 4. Proper # and type of spare heads to be located in box, on site, w/ required wrenches. 5. Repair/replace escutcheons