Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T08FR04159
Case Details
Entered Date:
11/04/2008
Applicant:
LERDAL LTD PRTNRSHP
Description:
SPRINKLER INSPECTION
Completed Inspections
Case Status: COMPLETE
Case Number: T08FR04159
Case Description: COMPLAINT (COMMERCIAL)
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/04/2008 | INSP - FULL | EDESCHAI | Approved | DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE REPAIR MANIFESTSHALL BE FORWARDED TO THIS OFFICE. 1) PROVIDE A HYDRAULIC CALCULATION PLATE FOR RISER # 2 2) PROVIDE CAPS FOR THE FIRE DEPARTMENT CONNECTION 3) THE SPARE HEAD BOS SHALL HAVE A FULL COMPLIMENT OF HEADS, PROVIDE 2 VERTICLE SIDEWALLS, 2 HORIZONTAL SIDEWALLS, 2 STANDARD PENDANT HEADS AND 2 QUICK RESPONSE STANDARD PENDANT HEADS. 3) IN THE BASEMENT THERE ARE 3 SPRINKLER HEADS THAT MAY BE OBSTRUCTED BY LIGHTS 4) BASEMENT STORE ROOM # 3, A SPRINKLER HEAD EXCEEDS THE ALLOWABLE DISTANCE FROM A WALL. REINSTATE A SPRINKLER HEAD AT THE PLUGGED OFF OUTLET. 5) THE GROUND FLOOR STAIRS AT # 52, LEADING TO THE BASEMENT IS LACKING SPRINKLER COVERAGE. PROVIDE COVERAGE. 6) SPRINKLERS THAT ARE 50 YEARS OLD SHALL EITHER HAVE A TESTED SAMPLE OR THEY SHALL BE CHANGED OUT. 7) IF THE CONTROL VALVE IS NOT IN A SECURE LOCATION IT SHALL HAVE A LOCK AND CHAIN 8) THE INSPECTORS TEST VALVE FOR SYSTEM # 2 SHALL BE LOCATED. |