Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T08FR03471
Case Details
Entered Date:
10/01/2008
Applicant:
PARK MU GIL & OAK MAI & PARK GEANIE Y & PARK
Description:
sprinkler test required
Completed Inspections
Case Status: COMPLETE
Case Number: T08FR03471
Case Description: INSPECTION
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2008 | INSP - FULL | EDESCHAI | Approved | DURING THE RECENT ANNUAL INSPECTION OF THE FIRE PROTECTION THE FOLLOWING DEFICIENCIES WERE FOUND AND SHALL BE CORRECTED WITHIN 30 DAYS. A COPY OF THE CORRECTION REPORT SHALL BE FORWARDED TO THIS OFFICE. A COPY OF THE ANNUAL FIRE ALARM REPORT SHALL BE FORWARDED ALSO. 1) A HYDRAULIC CALCULATION PLATE SHALL BE AT THE SPRINKLER RISER 2) THE SPRINKLER HEADS IN THE LOBBY ARE DUST LOADED AND NEED TO BE CLEANED 3) 1ST. FLOOR OFFICE AREA, THE FLEX DUCT WORK IS OBSTRUCTING SPRINKLER SPRAY PATTERN.(PROJECTION CLOSET. 4) CORRECT SPRINKLER COVERAGE SHALL BE BOARD ROOM, IN THE CORNER BY THE COFFEE BAR. 5) FITNESS ROOM-DUE TO A REMODEL A SPRINKLER HEAD EXCEEDS THE ALLOWABLE DISTANCE OFF THE WEST WALL, ONE SHALL BE ADDED. 6) SECOND FLOOR, NORTH STORE ROOM, PROVIDE THE HEAD GUARD FOR THE SPRINKLER 7) 5TH. FLOOR STAIRS - REPLACE THE NOT ON THE HANDLE FOR THE FIRE HOSE VALVE. 8) ALL SPRINKLER HEADS IN THE KITCHEN SHALL BE THE SAME 4) |