Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T08FR01716
Case Details
Entered Date:
06/26/2008
Applicant:
RESEDA COLONIA LLC 2.21% & LINCOLN COLONIA LLC
Description:
SPRINKLER INSPECTION
Completed Inspections
Case Status: FIELD
Case Number: T08FR01716
Case Description: INSPECTION
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/26/2008 | INSP - FULL | EDESCHAI | Approved | 1) tHE MAIN DRAINS ON THE RISER ARE NOT CLOSING AND NEED TO BE REPAIRED 2) THE INSPECTORS TEST VALVE LEAKS AND NEEDS REPAIR 3) THE FIRE DEPARTMENT CONNECTION NEEDS PROTECTIVE CAPS INSTALLED 4) THE TAMPER CONTROL VALVE AT THE RISER DID NOT RESET AND NEEDS REPAIR 5) tHE FIRE DEPT. CONNECTION NEEDS TO BE BRACED AND STRAIGNTENED OUT 6) tHE S/W COOLER HAS CORRODED HEADS, REPLACE |