Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

COMPLETE

Type:

INSPECTION
Address:

Entered Date:

05/30/2008

Applicant:

TRANSAMERICA TITLE TR RH-26842

Description:

fire inspection

Completed Inspections

Case Status: COMPLETE
Case Number: T08FR01367
Case Description: INSPECTION
Total Completed Inspections - 1
End Date Description Inspector Results Comments
05/30/2008 VIOL - FIRE PROTECTION SYSTEMS EDESCHAI Approved 901.6 Maintenance of fire protection equipment 1) The hydraulic calculation plates at the riser were painted over and shall be replaced 2) The control valves shall have identification plates affixed 3) The plastic pipe for the sump pump shall be removed fron sprinkler piping 4) The plexiglass roof in the jamming area shall be removed or sprinkler protection added to the under side. the addition of sprinklers to this area will require submittals and permits. Submittals shall be made within 30 days and work completed with in 60 days 5) Sprinkler protection shall be added to the small office restroom. submittals are also required. 6) Keys shall be available for removing the lock at the main riser so that an annual flow test can be performed on the water supply