Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T08FR01367
Case Details
Entered Date:
05/30/2008
Applicant:
TRANSAMERICA TITLE TR RH-26842
Description:
fire inspection
Completed Inspections
Case Status: COMPLETE
Case Number: T08FR01367
Case Description: INSPECTION
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/30/2008 | VIOL - FIRE PROTECTION SYSTEMS | EDESCHAI | Approved | 901.6 Maintenance of fire protection equipment 1) The hydraulic calculation plates at the riser were painted over and shall be replaced 2) The control valves shall have identification plates affixed 3) The plastic pipe for the sump pump shall be removed fron sprinkler piping 4) The plexiglass roof in the jamming area shall be removed or sprinkler protection added to the under side. the addition of sprinklers to this area will require submittals and permits. Submittals shall be made within 30 days and work completed with in 60 days 5) Sprinkler protection shall be added to the small office restroom. submittals are also required. 6) Keys shall be available for removing the lock at the main riser so that an annual flow test can be performed on the water supply |