Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T07FR01457
Case Details
Entered Date:
08/02/2007
Applicant:
C&T OIL CO INC
Description:
A Interdepartment complaint was initiated on 8/1/07.
Outstanding Inspections
Case Number: T07FR01457
Case Status: COMPLETE
Case Description: COMPLAINT (COMMERCIAL)
Total Outstanding Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2007 | VIOL - HAZARDOUS MATERIALS,GEN | JBURGE | Correction Required | TFC 2703.3.1.4 #1.A written spill mitigation plan shall be developed and distributed to all employees, to ensure that proper actions are taken in the event of a hazardous material spill. #2.The fire department shall be provided with such a plan. A re-inspection is scheduled 8-16-07. |
Completed Inspections
Case Status: COMPLETE
Case Number: T07FR01457
Case Description: COMPLAINT (COMMERCIAL)
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/16/2007 | INSP - LIFE SAFETY | JBURGE | Approved | All noted Tucson Fire Code violations were corrected on 8/16/07. |