Inspection History Details
Inspection Status: Correction Required
Inspection History: VIOL - HAZARDOUS MATERIALS,GEN
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2007 | VIOL - HAZARDOUS MATERIALS,GEN | Correction Required | TFC 2703.3.1.4 #1.A written spill mitigation plan shall be developed and distributed to all employees, to ensure that proper actions are taken in the event of a hazardous material spill. #2.The fire department shall be provided with such a plan. A re-inspection is scheduled 8-16-07. |