Case: T07FR01062
Case Details
Entered Date:
06/01/2007
Applicant:
AGARWAL RAJ & DARSHAN
Description:
lpg
Completed Inspections
Case Status: COMPLETE
Case Number: T07FR01062
Case Description: INSPECTION
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2007 | INSP - AST/UST | CFUNKE | Approved | 3807.1 Safety devices. Safety devices on LPG containers, equipment and systems, shall not be tampered with or made ineffective. LPG containers are required to have current certification according to manufacturer's specifications. - The fusible link on the thermal accuated device shall have a melting point of no more than 250 degrees F. |
| 06/14/2007 | INSP - REINSPECTION | JLANGEJA | Approved | Servi Gas was on site to de-fuel 1000 gal. propane tank in order to replace a thermal actuated valve below the liquid level. Fuel that could not be pumped out was burned off until the pressure was gone. They will recontact when they are ready to put tank back in service. |