Inspection History Details
Inspection Status: Approved
Inspection History: INSP - AST/UST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2008 | INSP - AST/UST | Approved | The valve was replaced with an approved device | |
| 06/01/2007 | INSP - AST/UST | Correction Required | 3807.1 Safety devices. Safety devices on LPG containers, equipment and systems, shall not be tampered with or made ineffective. LPG containers are required to have current certification according to manufacturer's specifications. - The fusible link on the thermal accuated device shall have a melting point of no more than 250 degrees F. |