Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T07FR01062

Parcel: 13104398A


Addresses:

4701 E 29TH ST

Inspection Status: Approved

Inspection History: INSP - AST/UST

Date Description Inspector Results Comments
04/10/2008 INSP - AST/UST Approved The valve was replaced with an approved device
06/01/2007 INSP - AST/UST Correction Required 3807.1 Safety devices. Safety devices on LPG containers, equipment and systems, shall not be tampered with or made ineffective. LPG containers are required to have current certification according to manufacturer's specifications.
- The fusible link on the thermal accuated device shall have a melting point of no more than 250 degrees F.