Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Case Details

Status:

COMPLETE

Type:

INSPECTION

Entered Date:

03/13/2006

Applicant:

BROADWAY POWERCENTER GROUP LLC

Description:

Fire Inspection done 3/13/06.

Completed Inspections

Case Status: COMPLETE
Case Number: T06FR00341
Case Description: INSPECTION
Total Completed Inspections - 9
End Date Description Inspector Results Comments
04/17/2006 VIOL - FIRE PROTECTION SYSTEMS BCOBB Approved As of 4/17/06 Abated, pull station moved to other side of kitchen door.
04/17/2006 VIOL - PRECAUTION AGAINST FIRE BCOBB Approved As of 4/17/06 ok to fry under temporary hood arrangement made, signed by Ideal fire [Brian].
05/18/2006 VIOL - FIRE RESIST.RATED CONST BCOBB Approved 4/28/06 Citation issued- failure to comply.
05/18/2006 VIOL - FIRE RESIST.RATED CONST BCOBB Approved As of re-inspection of 4/17/06, Failure to comply.
05/18/2006 VIOL - BUILDING SVCS & SYSTEMS BCOBB Approved As of re-inspection of 4/17/06, in compliance.
08/18/2006 INSP - REINSPECTION BCOBB Approved This case has been satisfied with the application of flame proofing to the ceiling decorations. Capt. Leach and Inspector Cobb performed a burn test and it passed [approx 6/5/06]. All other issues have been abated. All documentation is in the file at TFD- Prevention office. Original citation was dismissed, and was going to be re-issued to the Corporation. The problem was abated in the meantime. No citation was re-issued. Case closed.
08/18/2006 VIOL - INT.FINISH, DEC. MATL'S BCOBB Approved
08/18/2006 VIOL - COMPRESSED GASES BCOBB Approved
08/18/2006 INSP - FULL BCOBB Approved