Case: CE-VIO1223-06751
Case Details
Status:
Active
Type:
MULT- Active renovation has been going on for months at this property and there is chronic accumulations of junk and remodeling waste left all over the front yard. Recently removed roll off with concrete debris left behind, trash/garbage, fencing is falling over, trash bins left tipped over in the yard, unsecured building/doors (front door with no lock, board or other security (attractive for trespassing/squatting overnight). Understandable that renovation would come with debris but they are not being considerate of how they leave the property on an ongoing basis and it is chronically unsightly (as well as a highly attractive to trespassers)
Address:
Entered Date:
12/06/2023
Applicant:
N/A
Description:
Completed Inspections
Case Status: Active
Case Number: CE-VIO1223-06751
Case Description: MULT- Active renovation has been going on for months at this property and there is chronic accumulations of junk and remodeling waste left all over the front yard. Recently removed roll off with concrete debris left behind, trash/garbage, fencing is falling over, trash bins left tipped over in the yard, unsecured building/doors (front door with no lock, board or other security (attractive for trespassing/squatting overnight). Understandable that renovation would come with debris but they are not being considerate of how they leave the property on an ongoing basis and it is chronically unsightly (as well as a highly attractive to trespassers)
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/12/2024 | COT - ENFC - Code Enforcement - Initial | In Violation | 1109 AM - Trash and debris to include construction material in front yard. Unscreened storage of bicycles and trash and debris in side yard. Both doors with door hardware are secure. Front door is missing hardware but it is secure at this time. Address is not displayed on the structure. Permit T22CM03368 is in Stop Work Order status for addition, and no work is going on at this time. Called and spoke to owner, advised 30 day NOV. -VM | |
03/06/2024 | COT - ENFC - Code Enforcement - Follow Up | In Violation | 238 PM - While in area, did hear work going on at the property and saw workers on site. Contact w/ worker at home, he states he is just installing the baseboards and caulking them and plans to paint them tomorrow. Did post the property w/ a stop work order as permit T22CM03368 is still in Stop Work Order status. Did advise worker can finish work tomorrow, but no other work to be done in the home. -VM |
Scheduled Inspections
SCase Number - CE-VIO1223-06751
Case Status: Active
Case Description:
Scheduled Date | Description | Inspector | Status |
---|---|---|---|
03/18/2024 | COT - ENFC - Code Enforcement - Follow Up | Scheduled |