Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: CE-VIO1125-05160
Case Details
Entered Date:
11/26/2025
Applicant:
N/A
Description:
Completed Inspections
Case Status: Active
Case Number: CE-VIO1125-05160
Case Description: TFD-Emergency commercial building fire
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2025 | COT - ENFC - Code Enforcement - Initial | In Violation | On site with TFD and TEP at a commercial building fire on the east end of the parcel. There is significant fire damage to the interior partition wall, wall cavity, ceiling and roof. Metal studs and block wall are exposed. There is possible structural damage. Plaster/drywall and insulation have been burned. Ceiling tiles are missing/damage. Ceiling grid shows evidence of heat/smoke impact. Electrical conduit appear to be exposed and possibly compromised. There roof drain that runs through the fire damaged wall is completely melted. There is possible smoke and water damage throughout the interior. Electric services have been shut off and locked by TEP. There is no gas service at this address. Water service is still active. Owner will secure. Permits required within 60 days. All work must be done by licensed contractor. |
Scheduled Inspections
SCase Number - CE-VIO1125-05160
Case Status: Active
Case Description:
| Scheduled Date | Description | Inspector | Status |
|---|---|---|---|
| 01/05/2026 | COT - ENFC - Code Enforcement - Follow Up | Scheduled |