Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: CE-VIO1122-00383
Case Details
Status:
Closed - Resolved
Type:
COURTCMP - MULT / Unit 112 Ceiling coming down in bedroom, water coimng up from bathroom flooring. Concerns for rest of structure in disrepair.
Address:
Entered Date:
11/10/2022
Applicant:
N/A
Description:
Completed Inspections
Case Status: Closed - Resolved
Case Number: CE-VIO1122-00383
Case Description: COURTCMP - MULT / Unit 112 Ceiling coming down in bedroom, water coimng up from bathroom flooring. Concerns for rest of structure in disrepair.
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/08/2022 | COT - ENFC - Code Enforcement - Initial | In Violation | 150 PM - WOOD ON THE CEILING, AND BEAMS WHERE THE SECOND FLOOR RAILING IS ATTACHED TO ARE ROTTING, CRACKING, AND HAVE PEELING PAINT ABOVE UNITS 112, 107 AND 105. WOOD IS SATURATED WITH WATER IN MULTIPLE PLACES AND UPON TOUCHING IT, THE WOOD BREAKS/CRUMBLES. A POST OF THE RAILING IS LOOSE DUE TO THE ROTTED CONDITION OF THE WOOD ABOVE UNIT 112, IN FRONT OF UNIT 205, AND ABOVE UNIT 102. THERE IS DAMAGE TO THE CEILING TO INCLUDE CRACKED DRYWALL ABOVE UNIT 203. THERE IS CRACKED/CRUMBLING PLASTER ON THE WALL NEAR THE OFFICE. THERE IS A CRACKED EXTERIOR WINDOW NEEDS TO BE REPLACED & SEALED AT UNIT 112. THE ADDRESS IS NOT DISPLAYED AT THE PROPERTY ACCESS POINT ALONG E MONTE VISTA DR. -VM | |
10/03/2023 | COT - ENFC - Code Enforcement - Follow Up | In Violation | 930 AM - Hearing held, counsel for Defendant present. Counsel submitted motion to set aside the default ruling due to having filed documentation with the courts prior to the arraignment date, motion was granted. City offered plea to plead responsible to all charges, total fines now $2,316 with default ruling set aside. Payments of $250 per month required and remainder can be suspended once all charges are brought into compliance, to include Completed permits for work done and for remaining work. Hearing continued to 1/16/2024 at 830 AM. -VM |