Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: CE-VIO1024-04323
Case Details
Status:
Active
Type:
TFD -Hazardous structural walk way 3rd floor Bldg 19 between 1923 & 1933
Address:
Entered Date:
10/28/2024
Applicant:
N/A
Description:
Completed Inspections
Case Status: Active
Case Number: CE-VIO1024-04323
Case Description: TFD -Hazardous structural walk way 3rd floor Bldg 19 between 1923 & 1933
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/29/2024 | COT - ENFC - Code Enforcement - Initial | In Violation | Bldg 19 3rd floor between unit 1923 and 1933 walk way structure is bowing in the center. Placed caution tape up and taped off the area. Am concerned about rental units below this walkway. Units 1922, 1923, 1912, 1913. IF walkway collapses debris will most definitely damage rental units below this walkway. Checked for permits. Did not see any permits on file. Resident mention building 20 next door also had a similar situation. Did not see any permits for the repair to the walkway area. Placed stop work order on area and will require permits and work to be completed by a LICENSED CONTRACTOR. Permits will be required for BLDG 19 & 20 Post stop work order on office door. Pictures uploaded |