Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: CE-VIO1023-06046
Case Details
Status:
Closed - Resolved
Type:
RMIN / Unit 103 / Water leaking in restroom vent front upstairs unit causing water stains and and restroom door damage
Address:
Entered Date:
10/16/2023
Applicant:
N/A
Description:
Completed Inspections
Case Status: Closed - Resolved
Case Number: CE-VIO1023-06046
Case Description: RMIN / Unit 103 / Water leaking in restroom vent front upstairs unit causing water stains and and restroom door damage
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/03/2023 | COT - ENFC - Code Enforcement - Follow Up | Passed | REVISITED SITE, FOUND LEAK IN UNIT 203 TUB HAD BEEN REPAIRED, THE CEILING IN THE HALLWAY OF UNIT 103 WAS REPAIRED, TUB AND TOILET CAULKED, DOOR I THE BATHROOM AND FRONT DOOR WERE BOTH SANDED AND NOW OPEN EASILY, BATHFAN REPLACE, WATER IN BATHROOM AND CARPET HALLWAY WAS EXTRACTED BATHROOM FLOORING OK. UNIT WAS ALSO SPRAYED FOR ROACHES AND OCCUPANT INFORMED THAT HE NEEDED TO CONTACT THE OFFICE WHEN THE UNIT REQUIRED PEST CONTROL. ALL ISSUES HAVE BEEN ABATED. COMPLIANCE / CLOSE CASE. |
Scheduled Inspections
SCase Number - CE-VIO1023-06046
Case Status: Closed - Resolved
Case Description:
Scheduled Date | Description | Inspector | Status |
---|---|---|---|
10/17/2023 | COT - ENFC - Code Enforcement - Initial | Scheduled |