Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: CE-VIO0923-05592
Case Details
Status:
Closed - Resolved
Type:
RMIN / Unit 109 / Water leak in Unit
Address:
Entered Date:
09/15/2023
Applicant:
N/A
Description:
Completed Inspections
Case Status: Closed - Resolved
Case Number: CE-VIO0923-05592
Case Description: RMIN / Unit 109 / Water leak in Unit
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/15/2023 | COT - ENFC - Code Enforcement - Initial | Passed | Did call the manager Julissa and she had the maintenance go to the site to check. They had already done the repairs to the water heater before where it was leaking. A video was sent where the water heater was and no leaking of water from the connection or water on the flooring. Could hear the tenant stating in Spanish that the complaint was called in way before this call came in. The tenant was happy at this time and has no other complaints and will be closing the case at this time. Violation Abated, Close Case. RV. |