Case: CE-VIO0826-03638
Case Details
Entered Date:
08/31/2026
Applicant:
Unknown
Description:
Completed Inspections
Case Status: Notice of Violation
Case Number: CE-VIO0826-03638
Case Description: EMER: TFD - FIRE CALL OUT
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2026 | COT - ENFC - Code Enforcement - Initial | In Violation | EMER: TFD - FIRE CALL OUT. Onsite with TFD, vacant property structure fire. City contractors to demo and fence for emergency abatement, roof collapsed during fire, structural cracks in walls. SWGAS and TEP onsite, gas banded on the 10th due to previous fire, electrical has been removed by TEP previously as well. Posting Notice of Emergency Abatement and Order to Vacate and Notice of Violation for removal of structure debris after emergency abatement demo and permits required for asbestos clearance and demo of the remaining structures on property. Local manager onsite, gave him copies of both forms and posted onsite. Informed him owner is responsible for emergency abatement demo and fencing, manager acknowledged and did not dispute. | |
| 11/02/2026 | COT - ENFC - Code Enforcement - Follow Up | In Violation | No change in the state ofthe debris or other structures. I emailed the PM to determine what timeline they are operating on. |
Scheduled Inspections
SCase Number - CE-VIO0826-03638
Case Status: Notice of Violation
Case Description:
| Scheduled Date | Description | Inspector | Status |
|---|---|---|---|
| 12/10/2026 | COT - ENFC - Code Enforcement - Follow Up | Scheduled |