Case: CE-VIO0426-01933
Case Details
Status:
Compliance Plan
Type:
RFIR - TFD Emergency callout for a two story house fire. ENERGOV BROKEN AT TIME OF FIRE ON 04/28/2026 CASE CREATED AFTER THE FACT.
Address:
Entered Date:
04/30/2026
Applicant:
N/A
Description:
Completed Inspections
Case Status: Compliance Plan
Case Number: CE-VIO0426-01933
Case Description: RFIR - TFD Emergency callout for a two story house fire. ENERGOV BROKEN AT TIME OF FIRE ON 04/28/2026 CASE CREATED AFTER THE FACT.
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2026 | COT - ENFC - Code Enforcement - Initial | In Violation | Arrived on scene at 1029 PM. Per TFD, there was a fire in the water heater area of the garage, possibly due to debris being stored around the water heater. TFD reports there is a charred 2 X 6 inside of the walls in the area of the water heater. Fire also was in the floor joist space in the area above the water heater, however it is unclear if structural members were damaged in this area. The drywall in garage has sustained heavy smoke damage throughout. Upon arrival, Southwest gas was searching for lines and reported no gas service to this residence. TEP was on scene prior to my arrival and electric is off at the meter. Home is condemned and may not be occupied. Owner on site signed indemnification and will secure structure. Permits required for all repairs including the replacement of water heater and use of licensed contractors are required. -VM | |
| 08/19/2026 | COT - ENFC - Code Enforcement - Follow Up | In Violation | Spoke to owner and there is a contractor currently working with the insurance company for restoration of the structure. F/U 30 days |
Scheduled Inspections
SCase Number - CE-VIO0426-01933
Case Status: Compliance Plan
Case Description:
| Scheduled Date | Description | Inspector | Status |
|---|---|---|---|
| 09/21/2026 | COT - ENFC - Code Enforcement - Follow Up | Scheduled |