Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

Active

Type:

PNI : Property maintenance deficiencies and need structure repairs.

Entered Date:

03/28/2024

Applicant:

N/A

Description:

Completed Inspections

Case Status: Active
Case Number: CE-VIO0324-01188
Case Description: PNI : Property maintenance deficiencies and need structure repairs.
Total Completed Inspections - 2
End Date Description Inspector Results Comments
03/28/2024 COT - ENFC - Code Enforcement - Initial In Violation There is trash and debris on the property. There are dead trees on the property. There are damaged light fixtures, and exposed electrical conductors that are not protected. New electrical circuit installed in non code compliant manner and is being used to energized a doorway patio light. There are damaged concrete steps and loose guard rails. There are unprotected walkway planks. There missing handicap signs, other posted handicap signs do not reflect development package requirements. The property does not reflect the last approved site plan for its landscape design near the office building. The running track is no longer in existence near the office area. The basketball court between building 8 and 7 is no longer in existence.
04/23/2024 COT - ENFC - Code Enforcement - Follow Up In Violation Met with Corp management and confirmed the following: Trash and debris has been disposed near consistent location. Electrical light fixture has been corrected from identified unit. Protective treatment has been applied on exposed wood. Damaged step has been replaced guardrails have been secured. Waiting on scheduling to remove dead trees and new renovation to recreational court area/ walking path. Large percentage of listed violations have been abated prior to scheduled follow up in May 2024.