Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: CE-VIO0323-02276
Case Details
Status:
Closed - Resolved
Type:
HPZ / e changes do not conform to the UDC 5.8.9 Design Standards. The property is listed as a non contributor but the inventory form notes the property was exposed unpainted burnt adobe which is how the building appeared before work started. Some time in the last 3 months the exposed burnt adobe (which was compatible) to the development zone was painted a stark white with black trim, the architectural iron work striped from the building, this removal has exposed sliding glass doors and windows. The work has changed the house from a compatible non-contributor to a highly intrusive building that now prominently features elements that were not allowable in the zone but covered. The work violates multiple sections of the design standards and is not just a color it is a significant change of material and form. The paint needs to be removed
Address:
Entered Date:
03/08/2023
Applicant:
N/A
Description:
Completed Inspections
Case Status: Closed - Resolved
Case Number: CE-VIO0323-02276
Case Description: HPZ / e changes do not conform to the UDC 5.8.9 Design Standards. The property is listed as a non contributor but the inventory form notes the property was exposed unpainted burnt adobe which is how the building appeared before work
started. Some time in the last 3 months the exposed burnt adobe (which was compatible) to the development zone was
painted a stark white with black trim, the architectural iron work striped from the building, this removal has exposed sliding
glass doors and windows. The work has changed the house from a compatible non-contributor to a highly intrusive
building that now prominently features elements that were not allowable in the zone but covered. The work violates
multiple sections of the design standards and is not just a color it is a significant change of material and form. The paint
needs to be removed
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/29/2025 | COT - ENFC - Code Enforcement - Initial | Completed | ||
| 07/03/2023 | COT - ENFC - Code Enforcement - Follow Up | In Violation | NO APPLICATION HAS BEEN MADE FOR THE HPZ VIOLATIONS |