Case Details

Status:

Citation

Type:

RWOP: Construction being done to the home with no permits. There are open trenches and the sidewalk has been torn for 3-4 months.

Entered Date:

02/26/2026

Applicant:

N/A

Description:

Completed Inspections

Case Status: Citation
Case Number: CE-VIO0226-00963
Case Description: RWOP: Construction being done to the home with no permits. There are open trenches and the sidewalk has been torn for 3-4 months.
Total Completed Inspections - 1
End Date Description Inspector Results Comments
06/16/2026 COT - ENFC - Code Enforcement - Initial In Violation 1021 am - Single family home under construction. Sidewalk removed in front of property. Water service line installed and trenched under sidewalk. 2 inch Sch 40 PVC line installed and sewer lines installed in the footprint of the future home. Concrete forms for footer installed. All activity completed without a permit. Permit TC-RES-0825-04071 was sent back for corrections in September 2025 and contractor never bothered to resubmit documents. Posted stop work order and NOV on site. Citation may be issued to contractor. -VM

Scheduled Inspections

SCase Number - CE-VIO0226-00963
Case Status: Citation
Case Description:
Scheduled Date Description Inspector Status
08/19/2026 COT - ENFC - Code Enforcement - Follow Up Scheduled