Address Search: 585 S CHERRY AV
Search
Permits
Address: 585 S CHERRY AV
Date - 08/20/2026 6:05 a.m.
Total Number Of Permits - (35)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| DP19-0175 | Issued | 07/24/2019 | 01/22/2027 | Development Package | SITE/GRADING/SWPPP - Cherry mixed use lofts, residential and commercial. | |
| T20CM02875 | Expired | 05/07/2020 | 01/04/2021 | Commercial Building | SITE UTILITY WTR LINES | |
| T20FC00296 | Expired | 05/06/2020 | 05/14/2021 | Fire Construction Permit | Automatic Fire Extingshing Sys - Bldg #11 - Underground Line; Commercial Fire Sprinkler Systems - Underground Fire Line Supply | |
| DP17-0060 | Complete | 03/20/2017 | 12/25/2017 | Development Package | SITE | |
| T03EL01862 | FINAL | 09/16/2003 | 02/19/2005 | #101 | ELECT | UPGRADE:ELECTRIC TO 400 AMP |
| T06EX00061 | CLOSED | 01/09/2006 | 03/10/2006 | EXCAV | EXCV: REPLACE 2 24' CONCRETE APRONS | |
| T19BU00472 | EXPIRED | 09/13/2019 | 03/16/2020 | DEMO | DEMO WAREHOUSE | |
| T19RW04874 | FINAL | 09/03/2019 | 10/03/2019 | ROW | (2) 5X5 BELLHOLES IN DIRT FRONT TO REPAIR/REPLACE GAS LINE | |
| T20FC00286 | FINAL | 05/06/2020 | 01/24/2021 | FIRECONS | Bldg #1 - Underground Line | |
| T20FC00287 | FINAL | 05/06/2020 | 05/16/2022 | FIRECONS | Bldg #2 - Underground Line | |
| T20FC00288 | FINAL | 05/06/2020 | 05/16/2022 | FIRECONS | Bldg #3 - Underground Line | |
| T20FC00289 | FINAL | 05/06/2020 | 05/16/2022 | FIRECONS | Bldg #4 - Underground Line | |
| T20FC00290 | FINAL | 05/06/2020 | 05/16/2022 | FIRECONS | Bldg #5 - Underground Line | |
| T20FC00291 | FINAL | 05/06/2020 | 05/16/2022 | FIRECONS | Bldg #6 - Underground Line | |
| T20FC00292 | FINAL | 05/06/2020 | 05/16/2022 | FIRECONS | Bldg #7 - Underground Line | |
| T20FC00293 | FINAL | 05/06/2020 | 05/16/2022 | FIRECONS | Bldg #8 - Underground Line | |
| T20FC00294 | FINAL | 05/06/2020 | 05/16/2022 | FIRECONS | Bldg #9 - Underground Line | |
| T20FC00295 | FINAL | 05/06/2020 | 05/16/2022 | FIRECONS | Bldg #10 - Underground Line | |
| T20FC00481 | FINAL | 07/21/2020 | 05/16/2022 | FIRECONS | New Sprinkler monitoring system - Adding new panel to monitor (22) water flow and tampers | |
| T20FC00710 | FINAL | 10/20/2020 | 05/17/2022 | FIRECONS | New NFPA-13R fire sprinkler system for 4-plex | |
| T20FC00711 | FINAL | 10/20/2020 | 05/17/2022 | FIRECONS | New NFPA-13R fire sprinkler system for 4-plex | |
| T20FC00712 | FINAL | 10/20/2020 | 05/17/2022 | FIRECONS | New NFPA-13R fire sprinkler system for 4-plex | |
| T20FC00713 | FINAL | 10/20/2020 | 05/17/2022 | FIRECONS | New NFPA-13R fire sprinkler system for 4-plex | |
| T20FC00714 | FINAL | 10/20/2020 | 05/03/2022 | FIRECONS | New NFPA-13R fire sprinkler system for 4-plex | |
| T20FC00715 | FINAL | 10/20/2020 | 05/03/2022 | FIRECONS | New NFPA-13R fire sprinkler system for 4-plex | |
| T20FC00716 | FINAL | 10/20/2020 | 05/03/2022 | FIRECONS | New NFPA-13R fire sprinkler system for 4-plex | |
| T20FC00717 | FINAL | 10/20/2020 | 05/03/2022 | FIRECONS | New NFPA-13R fire sprinkler system for 4-plex | |
| T20FC00718 | FINAL | 10/20/2020 | 05/03/2022 | FIRECONS | New NFPA-13R fire sprinkler system for 4-plex | |
| T20FC00853 | FINAL | 12/24/2020 | 05/17/2022 | FIRECONS | BLDG 1 - New NFPA-13R fire sprinkler system for 4-plex | |
| T20RW01095 | FINAL | 02/21/2020 | 08/22/2020 | ROW | CONNECT TO EXISTING SEWER - 30' TRENCH AND WATER - 90' TRENCH FOR DEVELOPMENT PACKAGE CHERRY MIXED USE LOFTS, DP19-0175. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. | |
| T20RW01874 | FINAL | 03/25/2020 | 07/08/2020 | ROW | N.679335 - DIG PIT REMOVE POLE, REMOVE ANCHORS & DOWN GUY, REMOVAL OF EXISTING PED & REPLACE WITH PRO 12 ON E 15TH ST & S KINO PKWY | |
| T20RW02579 | FINAL | 05/06/2020 | 08/05/2020 | ROW | N.687688 JOB WILL REQUIRE 57' OF BORE AND 16SQFT OF CONCRETE REMOVAL/REPLACEMENT. | |
| T21RW04067 | FINAL | 09/01/2021 | 12/09/2021 | ROW | N.903814-ALONG S. CHERRY AVE REMOVE AND REPLACE DOWN GUY AND ANCHOR. Proof of notification is required at the time of the preconstruction meeting. | |
| T97OT00116 | C OF O | 06/27/1997 | 01/24/1998 | #101 | C-OF-O | C OF O INSPECTION:OFFICE:NO CHANGE OF USE |
| T97OT00117 | WITHDRWN | 06/27/1997 | N/A | #151 | C-OF-O | C OF O INSPECTION: |
Plans
Address: 585 S CHERRY AV
Date - 08/20/2026 6:05 a.m.
Total Number Of Plans - (6)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| C9-19-11 | EFFECTED | 06/25/2019 | N/A | REZONING PROCEDURES -- REZONE | ||
| S17-011 | FINAL | 03/20/2017 | N/A | LOT SPLIT -- LSPT | ||
| T17PRE0109 | CLOSED | 12/29/2017 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | ||
| T18PRE0029 | CLOSED | 03/05/2018 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | ||
| T19PRE0055 | APPLIED | 04/01/2019 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | Labels | |
| T19PRE0085 | PLAN CK | 05/22/2019 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS |