Address Search: 5255 E 29TH ST
Search
Parcel Attributes
| Parcel | 13103222C |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | O-3 |
| Tucson Ward | Ward 4 |
| Tucson Registered Neighborhood | Myers |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 5255 E 29TH ST
Date - 10/05/2026 9:51 p.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 5255 E 29TH ST
Date - 10/05/2026 9:51 p.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000005778 | CLOSED | 06/11/2014 | N/A | Historical Information | RECORD TO SHOW BILLBOARD AZ488/CLEAR CHANNEL #301 REMOVED DUE TO STORM DAMAGE |
Permits
Address: 5255 E 29TH ST
Date - 10/05/2026 9:51 p.m.
Total Number Of Permits - (23)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0823-01882 | Issued | 08/02/2023 | 02/06/2024 | BLDG 2 UNIT 62 | Commercial Building | Electrical Reconnect |
| TC-COM-0723-01832 | Issued | 07/27/2023 | 02/06/2024 | BLDG 2 UNIT 78 | Commercial Building | Electrical Reconnect |
| TR-ROW-0626-00695 | Expired | 06/09/2026 | 09/18/2026 | Right-of-Way (ROW) | Trees and shrub beautification at 6 bus stops on 22nd and 29th street near Rosemont Ave. 08/19/2026 - Request for 30 Day Renewal as of 08/19/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts. | |
| T08CM00716 | EXPIRED | 03/03/2008 | 11/08/2008 | #77 | COMBO | REPAIR: APARTMENT FIRE DAMAGE |
| T08OT00508 | FINAL | 03/04/2008 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT: FOR T08CM00716 | |
| T09CM01543 | WITHDRWN | 06/16/2009 | N/A | COMBO | 14 NEW APARTMENT UNITS TO EXISTING APT COMPLEX | |
| T10CM00278 | FINAL | 02/03/2010 | 03/15/2011 | COMBO | ADD 2 40 SQ FT SOLAR HOT WATER SYSTEMS FOR 2 APARTMENT COMPLEX LAUNDRY ROOMS | |
| T10CM00522 | FINAL | 03/04/2010 | 10/04/2010 | COMBO | SOLAR PHOTO VOLTAIC - 88 PANELS | |
| T10OT00272 | FINAL | 02/03/2010 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT: SOLAR HOT WATER SYSTEM | |
| T10OT00484 | FINAL | 03/04/2010 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT 5 PV Solar Systems | |
| T12CM07984 | FINAL | 12/18/2012 | 06/19/2013 | #18 | COMBO | ELECTRIC RECONNECT |
| T13CM02106 | FINAL | 04/10/2013 | 10/09/2013 | #12 | COMBO | ELECTRIC RECONNECT |
| T14TC03285 | FINAL | 12/15/2014 | N/A | BARRICAD | Tucson Water Maintenance Daily 12-04-14 | |
| T15CM08509 | FINAL | 12/04/2015 | 06/14/2016 | #50 | COMBO | REPL 125 AMP LIKE FOR LIKE;APT |
| T17CM08951 | FINAL | 12/05/2017 | 07/24/2018 | COMBO | Automatic gate | |
| T18CM05230 | FINAL | 07/05/2018 | 01/05/2019 | #61 | COMBO | ELECTRICAL RECONNECT |
| T19CM07625 | EXPIRED | 10/16/2019 | 08/03/2020 | #79 | COMBO | E - ELECTRIC RECONNECT |
| T20CM00829 | FINAL | 02/04/2020 | 08/23/2021 | #62 | COMBO | E - ELECTRIC RECONNECT |
| T20CM09130 | FINAL | 12/29/2020 | 08/25/2021 | 36 | COMBO | electric reconnect for apartment 36. Been off for more than 6 months. |
| T20CM09212 | WITHDRWN | 12/29/2020 | 06/27/2021 | #36 | COMBO | Electrical reconnect |
| T20CM09216 | FINAL | 12/29/2020 | 08/25/2021 | 79 | COMBO | ELECTRICAL RECONNECT |
| T22RW01667 | FINAL | 04/27/2022 | 07/06/2022 | ROW | From TEP Pole at 5255 E 29th St, Head E and begin 1595' aerial overlash 144ct fiber. Tie in. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 4. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 5. MAINTAIN PEDESTRIAN ACCESS 6. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 | |
| T97EL01554 | FINAL | 09/24/1997 | 03/25/1998 | #30 | ELECT | RECONNECT:ELECTRIC:APARTMENT |
Code Enforcement
Address: 5255 E 29TH ST
Date - 10/05/2026 9:51 p.m.
Total Number Of Code Cases - (1)
| Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO1222-00767 | Closed - Unfounded | 12/01/2022 | 01/18/2023 | WASTE: animal waste accumulating along common areas of complex |