Permit Details

Status:
Expired
Type:
Right-of-Way (ROW)
Address NEW:
1842 S ROSEMONT AV
Apply Date:
06/09/2026
Applicant:
Description:
Trees and shrub beautification at 6 bus stops on 22nd and 29th street near Rosemont Ave. 08/19/2026 - Request for 30 Day Renewal as of 08/19/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Permit Reviews

Permit Number - TR-ROW-0626-00695
Permit Status: Expired
Permit Description: Trees and shrub beautification at 6 bus stops on 22nd and 29th street near Rosemont Ave. 08/19/2026 - Request for 30 Day Renewal as of 08/19/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Start Date Submittal Complete Date Status  
06/09/2026 RIGHT-OF-WAY REVIEW v.1 06/25/2026 REQUIRES RESUBMIT Review Details
07/02/2026 RIGHT-OF-WAY REVIEW v.2 07/07/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0626-00695
Permit Status: Expired
Permit Description: Trees and shrub beautification at 6 bus stops on 22nd and 29th street near Rosemont Ave. 08/19/2026 - Request for 30 Day Renewal as of 08/19/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 4
Date Name
06/10/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
06/10/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/10/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/10/2026 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14

Outstanding Inspections

Permit Status: Expired
Permit Number: TR-ROW-0626-00695
Permite Description: Trees and shrub beautification at 6 bus stops on 22nd and 29th street near Rosemont Ave. 08/19/2026 - Request for 30 Day Renewal as of 08/19/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
08/19/2026 TRSP - ROW - Barricade - Setup/Routine N/A Not Ready Job does not have mobilization start date yet, and permit expires today. New pre-reactivity meeting will be held after permit is extended and new start date is scheduled.
08/19/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Re-inspection required Job does not have mobilization start date yet, and permit expires today. New pre-reactivity meeting will be held after permit is extended and new start date is scheduled.
08/19/2026 TRSP - ROW - Backfill - Placement/Compaction N/A Not Ready Job does not have mobilization start date yet, and permit expires today. New pre-activity meeting will be held after permit is extended and new start date is scheduled.
08/19/2026 TRSP - ROW - Final N/A Not Ready Job does not have mobilization start date yet, and permit expires today. New pre-activity meeting will be held after permit is extended and new start date is scheduled.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DB 72614 - PAGE 1 - 29TH - ROSEMONT - SHOULDER CLOSURE (1)_V2.PDF DOCUMENTS VIEW
DB 72614 - PAGE 2 - 22ND - ROSEMONT - SHOULDER CLOSURE (1)_V2.PDF DOCUMENTS VIEW
THRIVE_BUS STOPS_SHEET SET_05_22_26_V1.PDF DOCUMENTS VIEW